Procedure to determing the maturity of management of projects based on NBR ISO 21.500:2012 norm
This work aims to present a procedure to determine the Project Management Maturity, a procedure based on the NBR ISO 21.500:2012 norm, to be used as a tool to evaluate the project management, and thus contribute to the success of the project. For that purpose, a questionnaire was developed which inc...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universidade Estadual Paulista
2018-09-01
|
Series: | GEPROS: Gestão da Produção, Operações e Sistemas |
Subjects: | |
Online Access: | https://revista.feb.unesp.br/index.php/gepros/article/view/1914 |
id |
doaj-37833c1ac0964b0dba84217b89b667d5 |
---|---|
record_format |
Article |
spelling |
doaj-37833c1ac0964b0dba84217b89b667d52020-11-25T01:42:32ZengUniversidade Estadual PaulistaGEPROS: Gestão da Produção, Operações e Sistemas1984-24302018-09-01133567610.15675/gepros.v13i3.1914Procedure to determing the maturity of management of projects based on NBR ISO 21.500:2012 normLaercio Avileis Junior0Olívio Novaski1Rosley Anholon2Jefferson de Souza Pinto3Universidade Estadual de CampinasUniversidade Estadual de CampinasUniversidade Estadual de CampinasUniversidade Estadual de CampinasThis work aims to present a procedure to determine the Project Management Maturity, a procedure based on the NBR ISO 21.500:2012 norm, to be used as a tool to evaluate the project management, and thus contribute to the success of the project. For that purpose, a questionnaire was developed which includes 39 questions related to the above-mentioned norm. This questionnaire was then submitted to companies that have projects as final products, as well as to companies that undertake project management in a systematic way. The research method consisted of an exploratory and descriptive field study through e-survey, which investigated the importance of the processes of project management. The answers were evaluated using statistical methods, namely Principal Components Analysis, which set the relative weights of each process. A parameterization was created to tabulate a score for each question, thus assessing the performance of project management of the organization. Hence the proposed model provides scores and criteria that will enable organizations to improve their processes continuously through systematic evaluations and the compilation of lessons learned.https://revista.feb.unesp.br/index.php/gepros/article/view/1914ProjectProject managementmaturity procedure for NBR ISO 21.500:2012 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Laercio Avileis Junior Olívio Novaski Rosley Anholon Jefferson de Souza Pinto |
spellingShingle |
Laercio Avileis Junior Olívio Novaski Rosley Anholon Jefferson de Souza Pinto Procedure to determing the maturity of management of projects based on NBR ISO 21.500:2012 norm GEPROS: Gestão da Produção, Operações e Sistemas Project Project management maturity procedure for NBR ISO 21.500:2012 |
author_facet |
Laercio Avileis Junior Olívio Novaski Rosley Anholon Jefferson de Souza Pinto |
author_sort |
Laercio Avileis Junior |
title |
Procedure to determing the maturity of management of projects based on NBR ISO 21.500:2012 norm |
title_short |
Procedure to determing the maturity of management of projects based on NBR ISO 21.500:2012 norm |
title_full |
Procedure to determing the maturity of management of projects based on NBR ISO 21.500:2012 norm |
title_fullStr |
Procedure to determing the maturity of management of projects based on NBR ISO 21.500:2012 norm |
title_full_unstemmed |
Procedure to determing the maturity of management of projects based on NBR ISO 21.500:2012 norm |
title_sort |
procedure to determing the maturity of management of projects based on nbr iso 21.500:2012 norm |
publisher |
Universidade Estadual Paulista |
series |
GEPROS: Gestão da Produção, Operações e Sistemas |
issn |
1984-2430 |
publishDate |
2018-09-01 |
description |
This work aims to present a procedure to determine the Project Management Maturity, a procedure based on the NBR ISO 21.500:2012 norm, to be used as a tool to evaluate the project management, and thus contribute to the success of the project. For that purpose, a questionnaire was developed which includes 39 questions related to the above-mentioned norm. This questionnaire was then submitted to companies that have projects as final products, as well as to companies that undertake project
management in a systematic way. The research method consisted of an exploratory and descriptive field study through e-survey, which investigated the importance of the processes of project management. The answers were evaluated using statistical methods, namely Principal Components Analysis, which set the relative weights of each process. A parameterization was created to tabulate a score for each question, thus assessing the performance of project management of the organization. Hence the proposed model provides scores and criteria that will enable organizations to improve their processes continuously through systematic evaluations and the compilation of lessons learned. |
topic |
Project Project management maturity procedure for NBR ISO 21.500:2012 |
url |
https://revista.feb.unesp.br/index.php/gepros/article/view/1914 |
work_keys_str_mv |
AT laercioavileisjunior proceduretodetermingthematurityofmanagementofprojectsbasedonnbriso215002012norm AT olivionovaski proceduretodetermingthematurityofmanagementofprojectsbasedonnbriso215002012norm AT rosleyanholon proceduretodetermingthematurityofmanagementofprojectsbasedonnbriso215002012norm AT jeffersondesouzapinto proceduretodetermingthematurityofmanagementofprojectsbasedonnbriso215002012norm |
_version_ |
1725035739404566528 |