Yonjung High-Speed Railway Bridge Assessment Using Output-Only Structural Health Monitoring Measurements under Train Speed Changing
Yonjung Bridge is a hybrid multispan bridge that is designed to transport high-speed trains (HEMU-430X) with maximum operating speed of 430 km/h. The bridge consists of simply supported prestressed concrete (PSC) and composite steel girders to carry double railway tracks. The structural health monit...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2016-01-01
|
Series: | Journal of Sensors |
Online Access: | http://dx.doi.org/10.1155/2016/4869638 |