FCB system analysis and performance test results of 1000MW ultra supercritical coal fired power station
Fast cut back (FCB) function can make the power station restore the external power supply in a very short period of time from the auxiliary power operation conditions through self-help mode. In case of large-scale power grid failure, FCB further ensures the safety of the main equipments and bring gr...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/09/e3sconf_iaecst20_04013.pdf |
id |
doaj-35f028d50c9f455f8d3b96466e2b2eef |
---|---|
record_format |
Article |
spelling |
doaj-35f028d50c9f455f8d3b96466e2b2eef2021-02-01T08:06:08ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012330401310.1051/e3sconf/202123304013e3sconf_iaecst20_04013FCB system analysis and performance test results of 1000MW ultra supercritical coal fired power stationShuying Zhang0Lin Li1Cuihua Zhang2Yan Gao3Tao Luan4Shandong Electric Power Engineering Consulting Institute Co.,Ltd.Shandong Electric Power Engineering Consulting Institute Co.,Ltd.Shandong Electric Power Engineering Consulting Institute Co.,Ltd.Department of Thermal Engineering, Shandong Jianzhu UniversitySchool of energy and power engineering, Shandong UniversityFast cut back (FCB) function can make the power station restore the external power supply in a very short period of time from the auxiliary power operation conditions through self-help mode. In case of large-scale power grid failure, FCB further ensures the safety of the main equipments and bring great benefits for the rapid recovery of local power grid. Taking Taishan Power Plant 1000 MW unit as a research object, the feasibility scheme of adding FCB function was analyzed and demonstrated on the basis of making full use of the original equipment design margin. The FCB test of TMCR 100% load was completed. The test results and problems during FCB process were discussed, and the corresponding countermeasures were proposed.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/09/e3sconf_iaecst20_04013.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Shuying Zhang Lin Li Cuihua Zhang Yan Gao Tao Luan |
spellingShingle |
Shuying Zhang Lin Li Cuihua Zhang Yan Gao Tao Luan FCB system analysis and performance test results of 1000MW ultra supercritical coal fired power station E3S Web of Conferences |
author_facet |
Shuying Zhang Lin Li Cuihua Zhang Yan Gao Tao Luan |
author_sort |
Shuying Zhang |
title |
FCB system analysis and performance test results of 1000MW ultra supercritical coal fired power station |
title_short |
FCB system analysis and performance test results of 1000MW ultra supercritical coal fired power station |
title_full |
FCB system analysis and performance test results of 1000MW ultra supercritical coal fired power station |
title_fullStr |
FCB system analysis and performance test results of 1000MW ultra supercritical coal fired power station |
title_full_unstemmed |
FCB system analysis and performance test results of 1000MW ultra supercritical coal fired power station |
title_sort |
fcb system analysis and performance test results of 1000mw ultra supercritical coal fired power station |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2021-01-01 |
description |
Fast cut back (FCB) function can make the power station restore the external power supply in a very short period of time from the auxiliary power operation conditions through self-help mode. In case of large-scale power grid failure, FCB further ensures the safety of the main equipments and bring great benefits for the rapid recovery of local power grid. Taking Taishan Power Plant 1000 MW unit as a research object, the feasibility scheme of adding FCB function was analyzed and demonstrated on the basis of making full use of the original equipment design margin. The FCB test of TMCR 100% load was completed. The test results and problems during FCB process were discussed, and the corresponding countermeasures were proposed. |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/09/e3sconf_iaecst20_04013.pdf |
work_keys_str_mv |
AT shuyingzhang fcbsystemanalysisandperformancetestresultsof1000mwultrasupercriticalcoalfiredpowerstation AT linli fcbsystemanalysisandperformancetestresultsof1000mwultrasupercriticalcoalfiredpowerstation AT cuihuazhang fcbsystemanalysisandperformancetestresultsof1000mwultrasupercriticalcoalfiredpowerstation AT yangao fcbsystemanalysisandperformancetestresultsof1000mwultrasupercriticalcoalfiredpowerstation AT taoluan fcbsystemanalysisandperformancetestresultsof1000mwultrasupercriticalcoalfiredpowerstation |
_version_ |
1724315633761386496 |