Optimal Maintenance of a Production System with Intermediate Buffers
We consider a production-inventory system that consists of an input-generating installation, a production unit and L intermediate buffers. It is assumed that the installation transfers the raw material to buffer and the production unit pulls the raw material from buffer We consider the problem...
Main Authors: | Constantinos C. Karamatsoukis, Epaminondas G. Kyriakidis |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2012-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2012/673864 |
Similar Items
-
Explicit Solution of the Average-Cost Optimality Equation for a Pest-Control Problem
by: Epaminondas G. Kyriakidis
Published: (2011-01-01) -
A New Maintenance Optimization Model Based on Three-Stage Time Delay for Series Intelligent System with Intermediate Buffer
by: Xiaolei Lv, et al.
Published: (2021-01-01) -
Method of rescheduling for hybrid production lines with intermediate buffers
by: Magiera Marek
Published: (2020-06-01) -
The Determination of Optimal Buffer Size and Preventive Maintenance Period for Repairable Systems
by: Jian-yi Young, et al.
Published: (2007) -
Adaptive policy of buffer allocation and preventive maintenance actions in unreliable production lines
by: Paolo Renna
Published: (2018-12-01)