PLANNING AND CONTROLLING INVENTORY OF COAL USING MODEL PROBABILISTIC Q BACKORDER WITH CONSIDER OF STORAGE CAPACITY
Inventory of fuel is very important in the production process, because the fuel is one factor that ensures smooth production process. PT. XYZ is a company engaged in provision power and steam with the coal. On determining amount of the current inventory of coal in PT XYZ still fluctuating from stora...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Brawijaya
2018-10-01
|
Series: | Journal of Engineering and Management in Industrial System |
Subjects: | |
Online Access: | https://jemis.ub.ac.id/index.php/jemis/article/view/280 |
id |
doaj-33f1d08c17d6440daa41fd617d672540 |
---|---|
record_format |
Article |
spelling |
doaj-33f1d08c17d6440daa41fd617d6725402020-11-25T02:11:16ZengUniversity of BrawijayaJournal of Engineering and Management in Industrial System2338-39252477-60252018-10-0161202610.21776/ub.jemis.2018.006.01.3199PLANNING AND CONTROLLING INVENTORY OF COAL USING MODEL PROBABILISTIC Q BACKORDER WITH CONSIDER OF STORAGE CAPACITYRatna Ekawati0Universitas Sultan Ageng TirtayasaInventory of fuel is very important in the production process, because the fuel is one factor that ensures smooth production process. PT. XYZ is a company engaged in provision power and steam with the coal. On determining amount of the current inventory of coal in PT XYZ still fluctuating from storage capacity, so it is necessary to study the planning and controlling inventory of coal with consider of storage capacity. This study aims to optimize the amount of the coal fuel, determine reorder point, determine safety stock and determine total cost of inventory using inventory probabilistik Q model backorder storage capacity constrain. Data processing results obtained optimal order for each the coal is as much as 11.000 tons, Reorder point is as much as 607,346 tons, safety stock is as much as 1,292 tons and total cost of inventory is as much as Rp. 16.052.531.575 using inventory probabilistik Q model backorder storage capacity constrain.https://jemis.ub.ac.id/index.php/jemis/article/view/280Inventory ControlProbabilistik Q ModelQ OptimalReorder pointSafety Stock |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Ratna Ekawati |
spellingShingle |
Ratna Ekawati PLANNING AND CONTROLLING INVENTORY OF COAL USING MODEL PROBABILISTIC Q BACKORDER WITH CONSIDER OF STORAGE CAPACITY Journal of Engineering and Management in Industrial System Inventory Control Probabilistik Q Model Q Optimal Reorder point Safety Stock |
author_facet |
Ratna Ekawati |
author_sort |
Ratna Ekawati |
title |
PLANNING AND CONTROLLING INVENTORY OF COAL USING MODEL PROBABILISTIC Q BACKORDER WITH CONSIDER OF STORAGE CAPACITY |
title_short |
PLANNING AND CONTROLLING INVENTORY OF COAL USING MODEL PROBABILISTIC Q BACKORDER WITH CONSIDER OF STORAGE CAPACITY |
title_full |
PLANNING AND CONTROLLING INVENTORY OF COAL USING MODEL PROBABILISTIC Q BACKORDER WITH CONSIDER OF STORAGE CAPACITY |
title_fullStr |
PLANNING AND CONTROLLING INVENTORY OF COAL USING MODEL PROBABILISTIC Q BACKORDER WITH CONSIDER OF STORAGE CAPACITY |
title_full_unstemmed |
PLANNING AND CONTROLLING INVENTORY OF COAL USING MODEL PROBABILISTIC Q BACKORDER WITH CONSIDER OF STORAGE CAPACITY |
title_sort |
planning and controlling inventory of coal using model probabilistic q backorder with consider of storage capacity |
publisher |
University of Brawijaya |
series |
Journal of Engineering and Management in Industrial System |
issn |
2338-3925 2477-6025 |
publishDate |
2018-10-01 |
description |
Inventory of fuel is very important in the production process, because the fuel is one factor that ensures smooth production process. PT. XYZ is a company engaged in provision power and steam with the coal. On determining amount of the current inventory of coal in PT XYZ still fluctuating from storage capacity, so it is necessary to study the planning and controlling inventory of coal with consider of storage capacity. This study aims to optimize the amount of the coal fuel, determine reorder point, determine safety stock and determine total cost of inventory using inventory probabilistik Q model backorder storage capacity constrain. Data processing results obtained optimal order for each the coal is as much as 11.000 tons, Reorder point is as much as 607,346 tons, safety stock is as much as 1,292 tons and total cost of inventory is as much as Rp. 16.052.531.575 using inventory probabilistik Q model backorder storage capacity constrain. |
topic |
Inventory Control Probabilistik Q Model Q Optimal Reorder point Safety Stock |
url |
https://jemis.ub.ac.id/index.php/jemis/article/view/280 |
work_keys_str_mv |
AT ratnaekawati planningandcontrollinginventoryofcoalusingmodelprobabilisticqbackorderwithconsiderofstoragecapacity |
_version_ |
1724915344998400000 |