Heuristics methods for the flow shop scheduling problem with separated setup times

This paper deals with the permutation flow shop scheduling problem with separated machine setup times. As a result of an investigation on the problem characteristics, four heuristics methods are proposed with procedures of the construction sequencing solution by an analogy with the asymmetric travel...

Full description

Bibliographic Details
Main Authors: Marcelo Seido Nagano, Marco Stabilito Mesquita
Format: Article
Language:English
Published: Universidade Federal de Santa Catarina 2012-06-01
Series:Revista Produção Online
Subjects:
Online Access:http://producaoonline.org.br/rpo/article/view/939

Similar Items