Implementation of Estrus Synchronization and Artificial Insemination Program (GBIB) in West Waringin Kota District, Central Kalimantan Province of Indonesia
The government has launched a program of self-sufficiency in meat as an effort to overcome the shortage of beef supply to meet the needs of the community, especially when the day of religious festivities. GBIB program Implementation is expected to meet the needs of the community will be beef, as dem...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201815006039 |
id |
doaj-3195c7f35b5c49909ccaeec05ea1a960 |
---|---|
record_format |
Article |
spelling |
doaj-3195c7f35b5c49909ccaeec05ea1a9602021-02-02T01:51:13ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-011500603910.1051/matecconf/201815006039matecconf_mucet2018_06039Implementation of Estrus Synchronization and Artificial Insemination Program (GBIB) in West Waringin Kota District, Central Kalimantan Province of IndonesiaKristiana TresiaHafid HarapinThe government has launched a program of self-sufficiency in meat as an effort to overcome the shortage of beef supply to meet the needs of the community, especially when the day of religious festivities. GBIB program Implementation is expected to meet the needs of the community will be beef, as demand for beef is always soaring demand every year, especially ahead of religious festivals. To discuss and review the implementation of the program stretcher author uses the theory EDWARDS III to determine the success or failure of the implementation of the program in the district of Kota Waringin Barat. Issues to be examined are 1) the quality and quantity of resources, 2) communication and dissemination program, 3) Attitude 4) Bureaucracy. This will be the focus to see the successful implementation of the program of snapping / sync Lust and optimize of GBIB in the district of Kota Waringin. This study uses the concept of a qualitative descriptive approach with the aim of providing an overview of how the implementation of the field program and then analyzed using the theory of Edwards III. The results of this study show that: 1) Aspects of Resource (HR, Information, Privileges and amenities), some support as the support means the production of drugs / vitamins and breeding stock (straw) superior adequate and well as the authority and the information available is quite good, while some aspects that do not support such as: HR, execution time, geographical conditions, transport facilities support, 2) aspect Communications (Transmission, Clarity, Consistency and Coordination) strongly supports the implementation of the program GBIB is 3) aspects of attitude (attitude implementer, Support Leader, Incentives for implementing and Transparency), relatively supportive in this program, and 4) Structural Aspects of Bureaucracy (SOP and Fragmentation) still do not support the implementation of the Program snapping Sexual arousal and this Artificial Insemination.https://doi.org/10.1051/matecconf/201815006039 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Kristiana Tresia Hafid Harapin |
spellingShingle |
Kristiana Tresia Hafid Harapin Implementation of Estrus Synchronization and Artificial Insemination Program (GBIB) in West Waringin Kota District, Central Kalimantan Province of Indonesia MATEC Web of Conferences |
author_facet |
Kristiana Tresia Hafid Harapin |
author_sort |
Kristiana Tresia |
title |
Implementation of Estrus Synchronization and Artificial Insemination Program (GBIB) in West Waringin Kota District, Central Kalimantan Province of Indonesia |
title_short |
Implementation of Estrus Synchronization and Artificial Insemination Program (GBIB) in West Waringin Kota District, Central Kalimantan Province of Indonesia |
title_full |
Implementation of Estrus Synchronization and Artificial Insemination Program (GBIB) in West Waringin Kota District, Central Kalimantan Province of Indonesia |
title_fullStr |
Implementation of Estrus Synchronization and Artificial Insemination Program (GBIB) in West Waringin Kota District, Central Kalimantan Province of Indonesia |
title_full_unstemmed |
Implementation of Estrus Synchronization and Artificial Insemination Program (GBIB) in West Waringin Kota District, Central Kalimantan Province of Indonesia |
title_sort |
implementation of estrus synchronization and artificial insemination program (gbib) in west waringin kota district, central kalimantan province of indonesia |
publisher |
EDP Sciences |
series |
MATEC Web of Conferences |
issn |
2261-236X |
publishDate |
2018-01-01 |
description |
The government has launched a program of self-sufficiency in meat as an effort to overcome the shortage of beef supply to meet the needs of the community, especially when the day of religious festivities. GBIB program Implementation is expected to meet the needs of the community will be beef, as demand for beef is always soaring demand every year, especially ahead of religious festivals. To discuss and review the implementation of the program stretcher author uses the theory EDWARDS III to determine the success or failure of the implementation of the program in the district of Kota Waringin Barat. Issues to be examined are 1) the quality and quantity of resources, 2) communication and dissemination program, 3) Attitude 4) Bureaucracy. This will be the focus to see the successful implementation of the program of snapping / sync Lust and optimize of GBIB in the district of Kota Waringin. This study uses the concept of a qualitative descriptive approach with the aim of providing an overview of how the implementation of the field program and then analyzed using the theory of Edwards III. The results of this study show that: 1) Aspects of Resource (HR, Information, Privileges and amenities), some support as the support means the production of drugs / vitamins and breeding stock (straw) superior adequate and well as the authority and the information available is quite good, while some aspects that do not support such as: HR, execution time, geographical conditions, transport facilities support, 2) aspect Communications (Transmission, Clarity, Consistency and Coordination) strongly supports the implementation of the program GBIB is 3) aspects of attitude (attitude implementer, Support Leader, Incentives for implementing and Transparency), relatively supportive in this program, and 4) Structural Aspects of Bureaucracy (SOP and Fragmentation) still do not support the implementation of the Program snapping Sexual arousal and this Artificial Insemination. |
url |
https://doi.org/10.1051/matecconf/201815006039 |
work_keys_str_mv |
AT kristianatresia implementationofestrussynchronizationandartificialinseminationprogramgbibinwestwaringinkotadistrictcentralkalimantanprovinceofindonesia AT hafidharapin implementationofestrussynchronizationandartificialinseminationprogramgbibinwestwaringinkotadistrictcentralkalimantanprovinceofindonesia |
_version_ |
1724310831050522624 |