Factors Influencing Sleeve Grouting Quality for Prefabricated Building: An Interpretive Structural Modeling Approach
The defect in quality caused by the noncompactness of sleeve grouting has become the main obstacle restricting the further implementation of the prefabricated building in China. Studies have been conducted to explore the influencing factors of inadequate grouting; however, few studies attempt to inv...
Main Authors: | Yingbo Ji, Zihao Zhao, Fuyi Yao, Hong Xian Li, Yanyao Li, Xiaoyun Du |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/5598424 |
Similar Items
-
Identification of Grout Sleeve Joint Defect in Prefabricated Structures Using Deep Learning
by: Hesheng Tang, et al.
Published: (2020-10-01) -
Study on Finite Element Model of the Prefabricated Reinforced Concrete Beam-Column Joints with Grouted Sleeves
by: Xiaoyong Luo, et al.
Published: (2021-01-01) -
Assessing and Prioritising Delay Factors of Prefabricated Concrete Building Projects in China
by: Yingbo Ji, et al.
Published: (2018-11-01) -
A BIM-Based Study on the Comprehensive Benefit Analysis for Prefabricated Building Projects in China
by: Yingbo Ji, et al.
Published: (2019-01-01) -
Ultrasonic Detection Method for Grouted Defects in Grouted Splice Sleeve Connector Based on Wavelet Pack Energy
by: Zuohua Li, et al.
Published: (2019-04-01)