Integrated Project Scheduling and Staff Assignment with Controllable Processing Times
This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assi...
Main Authors: | Victor Fernandez-Viagas, Jose M. Framinan |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2014-01-01
|
Series: | The Scientific World Journal |
Online Access: | http://dx.doi.org/10.1155/2014/924120 |
Similar Items
-
Controllable Processing Times in Project and Production Management: Analysing the Trade-Off between Processing Times and the Amount of Resources
by: Victor Fernandez-Viagas, et al.
Published: (2015-01-01) -
Due-Window Assignment Scheduling with Variable Job Processing Times
by: Yu-Bin Wu, et al.
Published: (2015-01-01) -
A Project Staff Assignment Model Considering Learning Effect
by: Shih-Hsiung Sun, et al.
Published: (2004) -
An Integrated Multi-Site Production Assignment and Scheduling System
by: Chih-Yung Lee, et al.
Published: (2002) -
An Integrated Model for Logistics Operation Scheduling and Work Assignment
by: Chih-Yuan Chen, et al.
Published: (2008)