Integrated Project Scheduling and Staff Assignment with Controllable Processing Times
This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assi...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2014-01-01
|
Series: | The Scientific World Journal |
Online Access: | http://dx.doi.org/10.1155/2014/924120 |
id |
doaj-3045949aa631498f9df978d232ebd743 |
---|---|
record_format |
Article |
spelling |
doaj-3045949aa631498f9df978d232ebd7432020-11-24T21:56:16ZengHindawi LimitedThe Scientific World Journal2356-61401537-744X2014-01-01201410.1155/2014/924120924120Integrated Project Scheduling and Staff Assignment with Controllable Processing TimesVictor Fernandez-Viagas0Jose M. Framinan1Industrial Management, School of Engineering, University of Seville, Camino de los Descubrimientos, s/n, 41092 Seville, SpainIndustrial Management, School of Engineering, University of Seville, Camino de los Descubrimientos, s/n, 41092 Seville, SpainThis paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.http://dx.doi.org/10.1155/2014/924120 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Victor Fernandez-Viagas Jose M. Framinan |
spellingShingle |
Victor Fernandez-Viagas Jose M. Framinan Integrated Project Scheduling and Staff Assignment with Controllable Processing Times The Scientific World Journal |
author_facet |
Victor Fernandez-Viagas Jose M. Framinan |
author_sort |
Victor Fernandez-Viagas |
title |
Integrated Project Scheduling and Staff Assignment with Controllable Processing Times |
title_short |
Integrated Project Scheduling and Staff Assignment with Controllable Processing Times |
title_full |
Integrated Project Scheduling and Staff Assignment with Controllable Processing Times |
title_fullStr |
Integrated Project Scheduling and Staff Assignment with Controllable Processing Times |
title_full_unstemmed |
Integrated Project Scheduling and Staff Assignment with Controllable Processing Times |
title_sort |
integrated project scheduling and staff assignment with controllable processing times |
publisher |
Hindawi Limited |
series |
The Scientific World Journal |
issn |
2356-6140 1537-744X |
publishDate |
2014-01-01 |
description |
This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times. |
url |
http://dx.doi.org/10.1155/2014/924120 |
work_keys_str_mv |
AT victorfernandezviagas integratedprojectschedulingandstaffassignmentwithcontrollableprocessingtimes AT josemframinan integratedprojectschedulingandstaffassignmentwithcontrollableprocessingtimes |
_version_ |
1725858853480824832 |