Fire risk assessment in Tehran metro line 1 (rectifier substation) with fault tree analysis
Background and a ims: Subway system including infrastructure systems in the transportation industry can potentially exposed to fire, flood, earthquake and similar events and could create catastrophic losses to society. Therefore, this study aims to assess the risk of fire in Tehran subway stations (...
Main Authors: | B Mortazavi, S Daneshvar, S Atr kar Roshan |
---|---|
Format: | Article |
Language: | fas |
Published: |
Iran University of Medical Sciences
2014-06-01
|
Series: | Salāmat-i kār-i Īrān |
Subjects: | |
Online Access: | http://ioh.iums.ac.ir/article-1-924-en.html |
Similar Items
-
Fire Risk Assessment and Its Economic Loss Estimation in Tehran Subway, Applying Event Tree Analysis
by: Sedigheh Atrkar Roshan, et al.
Published: (2015-01-01) -
Measuring the Noise Caused by Tehran Metro
by: Majid Abbas Pour, et al.
Published: (1999-03-01) -
Open Circuit Fault Diagnosis and Fault Tolerance of Three-Phase Bridgeless Rectifier
by: Hong Cheng, et al.
Published: (2018-11-01) -
Open-circuit fault detection technique for fault-tolerant bridgeless boost rectifier
by: Abdul Razak, R.K, et al.
Published: (2018) -
Review of Substation Grounding System Behavior Under High Frequency and Transient Faults in Uniform Soil
by: Navinesshani Permal, et al.
Published: (2020-01-01)