Proactive and Reactive Multi-Project Scheduling in Uncertain Environment
In this paper, a proactive and reactive multi-project scheduling problem is addressed. This problem is related to the influences of uncertain factors, which leads to a deviation between actual scheduling and baseline scheduling, and a recovery strategy is established in order to generate a baseline...
Main Authors: | Weixin Wang, Xianlong Ge, Lvcheng Li, Jiafu Su |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2019-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/8754773/ |
Similar Items
-
Tracking Predictive Gantt Chart for Proactive Rescheduling in Stochastic Resource Constrained Project Scheduling
by: Mario Brčić, et al.
Published: (2018-01-01) -
Tracking Predictive Gantt Chart for Proactive Rescheduling in Stochastic Resource Constrained Project Scheduling
by: Mario Brčić, et al.
Published: (2018-12-01) -
Metaheuristic Algorithms for Proactive and Reactive Project Scheduling to Minimize Contractor’s Cash Flow Gap under Random Activity Duration
by: Minjing Ning, et al.
Published: (2018-01-01) -
The Spectrum of Proactive, Resilient Multi-Microgrid Scheduling: A Systematic Literature Review
by: Michael H. Spiegel, et al.
Published: (2020-09-01) -
A Multi-PR Heuristic for Distributed Multi-Project Scheduling With Uncertain Duration
by: Dongning Liu, et al.
Published: (2020-01-01)