Use of statistical simulation in construction planning
In this paper, the researchers propose taking into account construction equipment recovery time to estimate the time consumption of construction and installation works. Post-failure recovery time can be modeled using Monte-Carlo simulation. Statistical simulation is used to create a general populati...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2017-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201710608011 |