Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction
This paper took the intensive receiving-end power grid as the research object and analysed the problems of three-phase short-circuit current over-limited of 500kV intensive power grid in the early stage of UHV construction. Firstly, this paper analysed the influence factors of the short-circuit curr...
Main Authors: | Zhang Xiao Hang, Sheng Si Qing, Li Fu Qiang, Hu Yu Ou, Zhang Wen Chao, Pan Yan |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2016-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | http://dx.doi.org/10.1051/matecconf/20166301039 |
Similar Items
-
Application of Incentive-Type Variable Weight in Decision of 500/220kV Received Electromagnetic Looped Grid Decomposing Operation
by: Haiyun Wang, et al.
Published: (2020-01-01) -
Application of UPFC in Fujian 500 kV power grid
by: Meng Li, et al.
Published: (2019-01-01) -
Short Circuit Analysis of 500KV Hubco-Jamshoro Transmission
Network and Improvement of Voltage Stability
by: Syed Asif AliShah, et al.
Published: (2011-10-01) -
Application of 500 kV UPFC in Suzhou southern power grid
by: Xu Wang, et al.
Published: (2019-01-01) -
Research on DC component decay time constant of 1000 kV AC filter circuit breakers in UHV converter station
by: Li Zhenqiang, et al.
Published: (2019-04-01)