Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction
This paper took the intensive receiving-end power grid as the research object and analysed the problems of three-phase short-circuit current over-limited of 500kV intensive power grid in the early stage of UHV construction. Firstly, this paper analysed the influence factors of the short-circuit curr...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2016-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | http://dx.doi.org/10.1051/matecconf/20166301039 |
id |
doaj-2dff812cf1904157a5377c388c5487d7 |
---|---|
record_format |
Article |
spelling |
doaj-2dff812cf1904157a5377c388c5487d72021-02-02T08:05:38ZengEDP SciencesMATEC Web of Conferences2261-236X2016-01-01630103910.1051/matecconf/20166301039matecconf_mmme2016_01039Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV ConstructionZhang Xiao Hang0Sheng Si Qing1Li Fu Qiang2Hu Yu Ou3Zhang Wen Chao4Pan Yan5College of Electrical and Electronic Engineering, North China Electric Power UniversityCollege of Electrical and Electronic Engineering, North China Electric Power UniversityNorth China Grid Company LimitedNorth China Grid Company LimitedNARI Group Corporation Beijing Monitoring Technology CenterNARI Group Corporation Beijing Monitoring Technology CenterThis paper took the intensive receiving-end power grid as the research object and analysed the problems of three-phase short-circuit current over-limited of 500kV intensive power grid in the early stage of UHV construction. Firstly, this paper analysed the influence factors of the short-circuit current based on self-impedance analysis model of two-port network theory and the equivalent model of UHV power grid. Then, the applicable current-limiting measures were put forward. Finally, this paper proposed one scheme to solve the problems of three-phase short-circuit current over-limited of 500kV buses in one practical receiving-end power grid and verified the feasibility of this scheme from three different aspects. Aiming at the over-limited influential factors, the applicable current-limiting measures can be taken as follows: separating the 500kV bus at UHV substation, lapping the lines outside the substation and decentralizing the power supplies. The proposed measures can effectively solve the problems of short-circuit current over-limited in the early stage of UHV construction and provide reference for other power grid.http://dx.doi.org/10.1051/matecconf/20166301039 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Zhang Xiao Hang Sheng Si Qing Li Fu Qiang Hu Yu Ou Zhang Wen Chao Pan Yan |
spellingShingle |
Zhang Xiao Hang Sheng Si Qing Li Fu Qiang Hu Yu Ou Zhang Wen Chao Pan Yan Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction MATEC Web of Conferences |
author_facet |
Zhang Xiao Hang Sheng Si Qing Li Fu Qiang Hu Yu Ou Zhang Wen Chao Pan Yan |
author_sort |
Zhang Xiao Hang |
title |
Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction |
title_short |
Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction |
title_full |
Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction |
title_fullStr |
Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction |
title_full_unstemmed |
Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction |
title_sort |
analysis of limiting measures of three-phase short-circuit current of 500kv intensive receiving-end power grid in the early stage of uhv construction |
publisher |
EDP Sciences |
series |
MATEC Web of Conferences |
issn |
2261-236X |
publishDate |
2016-01-01 |
description |
This paper took the intensive receiving-end power grid as the research object and analysed the problems of three-phase short-circuit current over-limited of 500kV intensive power grid in the early stage of UHV construction. Firstly, this paper analysed the influence factors of the short-circuit current based on self-impedance analysis model of two-port network theory and the equivalent model of UHV power grid. Then, the applicable current-limiting measures were put forward. Finally, this paper proposed one scheme to solve the problems of three-phase short-circuit current over-limited of 500kV buses in one practical receiving-end power grid and verified the feasibility of this scheme from three different aspects. Aiming at the over-limited influential factors, the applicable current-limiting measures can be taken as follows: separating the 500kV bus at UHV substation, lapping the lines outside the substation and decentralizing the power supplies. The proposed measures can effectively solve the problems of short-circuit current over-limited in the early stage of UHV construction and provide reference for other power grid. |
url |
http://dx.doi.org/10.1051/matecconf/20166301039 |
work_keys_str_mv |
AT zhangxiaohang analysisoflimitingmeasuresofthreephaseshortcircuitcurrentof500kvintensivereceivingendpowergridintheearlystageofuhvconstruction AT shengsiqing analysisoflimitingmeasuresofthreephaseshortcircuitcurrentof500kvintensivereceivingendpowergridintheearlystageofuhvconstruction AT lifuqiang analysisoflimitingmeasuresofthreephaseshortcircuitcurrentof500kvintensivereceivingendpowergridintheearlystageofuhvconstruction AT huyuou analysisoflimitingmeasuresofthreephaseshortcircuitcurrentof500kvintensivereceivingendpowergridintheearlystageofuhvconstruction AT zhangwenchao analysisoflimitingmeasuresofthreephaseshortcircuitcurrentof500kvintensivereceivingendpowergridintheearlystageofuhvconstruction AT panyan analysisoflimitingmeasuresofthreephaseshortcircuitcurrentof500kvintensivereceivingendpowergridintheearlystageofuhvconstruction |
_version_ |
1724297888595443712 |