Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction

This paper took the intensive receiving-end power grid as the research object and analysed the problems of three-phase short-circuit current over-limited of 500kV intensive power grid in the early stage of UHV construction. Firstly, this paper analysed the influence factors of the short-circuit curr...

Full description

Bibliographic Details
Main Authors: Zhang Xiao Hang, Sheng Si Qing, Li Fu Qiang, Hu Yu Ou, Zhang Wen Chao, Pan Yan
Format: Article
Language:English
Published: EDP Sciences 2016-01-01
Series:MATEC Web of Conferences
Online Access:http://dx.doi.org/10.1051/matecconf/20166301039
id doaj-2dff812cf1904157a5377c388c5487d7
record_format Article
spelling doaj-2dff812cf1904157a5377c388c5487d72021-02-02T08:05:38ZengEDP SciencesMATEC Web of Conferences2261-236X2016-01-01630103910.1051/matecconf/20166301039matecconf_mmme2016_01039Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV ConstructionZhang Xiao Hang0Sheng Si Qing1Li Fu Qiang2Hu Yu Ou3Zhang Wen Chao4Pan Yan5College of Electrical and Electronic Engineering, North China Electric Power UniversityCollege of Electrical and Electronic Engineering, North China Electric Power UniversityNorth China Grid Company LimitedNorth China Grid Company LimitedNARI Group Corporation Beijing Monitoring Technology CenterNARI Group Corporation Beijing Monitoring Technology CenterThis paper took the intensive receiving-end power grid as the research object and analysed the problems of three-phase short-circuit current over-limited of 500kV intensive power grid in the early stage of UHV construction. Firstly, this paper analysed the influence factors of the short-circuit current based on self-impedance analysis model of two-port network theory and the equivalent model of UHV power grid. Then, the applicable current-limiting measures were put forward. Finally, this paper proposed one scheme to solve the problems of three-phase short-circuit current over-limited of 500kV buses in one practical receiving-end power grid and verified the feasibility of this scheme from three different aspects. Aiming at the over-limited influential factors, the applicable current-limiting measures can be taken as follows: separating the 500kV bus at UHV substation, lapping the lines outside the substation and decentralizing the power supplies. The proposed measures can effectively solve the problems of short-circuit current over-limited in the early stage of UHV construction and provide reference for other power grid.http://dx.doi.org/10.1051/matecconf/20166301039
collection DOAJ
language English
format Article
sources DOAJ
author Zhang Xiao Hang
Sheng Si Qing
Li Fu Qiang
Hu Yu Ou
Zhang Wen Chao
Pan Yan
spellingShingle Zhang Xiao Hang
Sheng Si Qing
Li Fu Qiang
Hu Yu Ou
Zhang Wen Chao
Pan Yan
Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction
MATEC Web of Conferences
author_facet Zhang Xiao Hang
Sheng Si Qing
Li Fu Qiang
Hu Yu Ou
Zhang Wen Chao
Pan Yan
author_sort Zhang Xiao Hang
title Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction
title_short Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction
title_full Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction
title_fullStr Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction
title_full_unstemmed Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction
title_sort analysis of limiting measures of three-phase short-circuit current of 500kv intensive receiving-end power grid in the early stage of uhv construction
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2016-01-01
description This paper took the intensive receiving-end power grid as the research object and analysed the problems of three-phase short-circuit current over-limited of 500kV intensive power grid in the early stage of UHV construction. Firstly, this paper analysed the influence factors of the short-circuit current based on self-impedance analysis model of two-port network theory and the equivalent model of UHV power grid. Then, the applicable current-limiting measures were put forward. Finally, this paper proposed one scheme to solve the problems of three-phase short-circuit current over-limited of 500kV buses in one practical receiving-end power grid and verified the feasibility of this scheme from three different aspects. Aiming at the over-limited influential factors, the applicable current-limiting measures can be taken as follows: separating the 500kV bus at UHV substation, lapping the lines outside the substation and decentralizing the power supplies. The proposed measures can effectively solve the problems of short-circuit current over-limited in the early stage of UHV construction and provide reference for other power grid.
url http://dx.doi.org/10.1051/matecconf/20166301039
work_keys_str_mv AT zhangxiaohang analysisoflimitingmeasuresofthreephaseshortcircuitcurrentof500kvintensivereceivingendpowergridintheearlystageofuhvconstruction
AT shengsiqing analysisoflimitingmeasuresofthreephaseshortcircuitcurrentof500kvintensivereceivingendpowergridintheearlystageofuhvconstruction
AT lifuqiang analysisoflimitingmeasuresofthreephaseshortcircuitcurrentof500kvintensivereceivingendpowergridintheearlystageofuhvconstruction
AT huyuou analysisoflimitingmeasuresofthreephaseshortcircuitcurrentof500kvintensivereceivingendpowergridintheearlystageofuhvconstruction
AT zhangwenchao analysisoflimitingmeasuresofthreephaseshortcircuitcurrentof500kvintensivereceivingendpowergridintheearlystageofuhvconstruction
AT panyan analysisoflimitingmeasuresofthreephaseshortcircuitcurrentof500kvintensivereceivingendpowergridintheearlystageofuhvconstruction
_version_ 1724297888595443712