The Schoonebeek Oilfield: the Rw-2e High Pressure Steam Injection Project Gisement de Schoonebeek : le projet RW-2E d'injection de vapeur à haute pression
The daily oil production from the Schoonebeek Oilfield amounts to some 1400 m3 /d, of which ca. 65% is produced from a high pressure (85 bar) steam injection project. This project was started in 1981 and originally consisted of 7 structurally downdip/middip steam injectors. However, following the in...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2006-11-01
|
Series: | Oil & Gas Science and Technology |
Online Access: | http://dx.doi.org/10.2516/ogst:1990007 |
id |
doaj-2d95734b8bfb4fdfaff68de612d79650 |
---|---|
record_format |
Article |
spelling |
doaj-2d95734b8bfb4fdfaff68de612d796502021-03-02T10:59:37ZengEDP SciencesOil & Gas Science and Technology1294-44751953-81892006-11-01451899710.2516/ogst:1990007The Schoonebeek Oilfield: the Rw-2e High Pressure Steam Injection Project Gisement de Schoonebeek : le projet RW-2E d'injection de vapeur à haute pression Holtam V. R.Van Den Boer M. J.Platenkamp R. J.The daily oil production from the Schoonebeek Oilfield amounts to some 1400 m3 /d, of which ca. 65% is produced from a high pressure (85 bar) steam injection project. This project was started in 1981 and originally consisted of 7 structurally downdip/middip steam injectors. However, following the initially somewhat disappointing project performance, steam injection was moved to 4 middip/ updip injectors in 1984. This change in the location of the steam injectors, together with an increase in the level of surveillance and a more pragmatic reservoir management policy, has resulted in improved project performance. The ultimate extra oil/steam ratio for the total project is now expected to be 0. 7 m3 oil/ton of steam injected. <br> La production de pétrole du gisement de Schoonebeek est d'environ 1400 m3/jour, dont près de 65% sont obtenus par injection de vapeur à haute pression (85 bar). Ce projet lancé en 1981 comportait initialement 7 injecteurs de vapeur orientés vers l'aval-pendage. En raison de performances décevantes, l'injection de vapeur a été transférée en 1984 sur 4 injecteurs travaillant vers l'amont-pendage. Ce changement de position des injecteurs, accompagné d'une surveillance renforcée et d'une politique de gestion du gisement plus pragmatique, a donné des résultats favorables. On pense que le rapport pétrole/vapeur pour l'ensemble du projet devrait être en dernière analyse de 0,7 m3 de pétrole par tonne de vapeur injectée. http://dx.doi.org/10.2516/ogst:1990007 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Holtam V. R. Van Den Boer M. J. Platenkamp R. J. |
spellingShingle |
Holtam V. R. Van Den Boer M. J. Platenkamp R. J. The Schoonebeek Oilfield: the Rw-2e High Pressure Steam Injection Project Gisement de Schoonebeek : le projet RW-2E d'injection de vapeur à haute pression Oil & Gas Science and Technology |
author_facet |
Holtam V. R. Van Den Boer M. J. Platenkamp R. J. |
author_sort |
Holtam V. R. |
title |
The Schoonebeek Oilfield: the Rw-2e High Pressure Steam Injection Project Gisement de Schoonebeek : le projet RW-2E d'injection de vapeur à haute pression |
title_short |
The Schoonebeek Oilfield: the Rw-2e High Pressure Steam Injection Project Gisement de Schoonebeek : le projet RW-2E d'injection de vapeur à haute pression |
title_full |
The Schoonebeek Oilfield: the Rw-2e High Pressure Steam Injection Project Gisement de Schoonebeek : le projet RW-2E d'injection de vapeur à haute pression |
title_fullStr |
The Schoonebeek Oilfield: the Rw-2e High Pressure Steam Injection Project Gisement de Schoonebeek : le projet RW-2E d'injection de vapeur à haute pression |
title_full_unstemmed |
The Schoonebeek Oilfield: the Rw-2e High Pressure Steam Injection Project Gisement de Schoonebeek : le projet RW-2E d'injection de vapeur à haute pression |
title_sort |
schoonebeek oilfield: the rw-2e high pressure steam injection project gisement de schoonebeek : le projet rw-2e d'injection de vapeur à haute pression |
publisher |
EDP Sciences |
series |
Oil & Gas Science and Technology |
issn |
1294-4475 1953-8189 |
publishDate |
2006-11-01 |
description |
The daily oil production from the Schoonebeek Oilfield amounts to some 1400 m3 /d, of which ca. 65% is produced from a high pressure (85 bar) steam injection project. This project was started in 1981 and originally consisted of 7 structurally downdip/middip steam injectors. However, following the initially somewhat disappointing project performance, steam injection was moved to 4 middip/ updip injectors in 1984. This change in the location of the steam injectors, together with an increase in the level of surveillance and a more pragmatic reservoir management policy, has resulted in improved project performance. The ultimate extra oil/steam ratio for the total project is now expected to be 0. 7 m3 oil/ton of steam injected. <br> La production de pétrole du gisement de Schoonebeek est d'environ 1400 m3/jour, dont près de 65% sont obtenus par injection de vapeur à haute pression (85 bar). Ce projet lancé en 1981 comportait initialement 7 injecteurs de vapeur orientés vers l'aval-pendage. En raison de performances décevantes, l'injection de vapeur a été transférée en 1984 sur 4 injecteurs travaillant vers l'amont-pendage. Ce changement de position des injecteurs, accompagné d'une surveillance renforcée et d'une politique de gestion du gisement plus pragmatique, a donné des résultats favorables. On pense que le rapport pétrole/vapeur pour l'ensemble du projet devrait être en dernière analyse de 0,7 m3 de pétrole par tonne de vapeur injectée. |
url |
http://dx.doi.org/10.2516/ogst:1990007 |
work_keys_str_mv |
AT holtamvr theschoonebeekoilfieldtherw2ehighpressuresteaminjectionprojectgisementdeschoonebeekleprojetrw2edinjectiondevapeurahautepression AT vandenboermj theschoonebeekoilfieldtherw2ehighpressuresteaminjectionprojectgisementdeschoonebeekleprojetrw2edinjectiondevapeurahautepression AT platenkamprj theschoonebeekoilfieldtherw2ehighpressuresteaminjectionprojectgisementdeschoonebeekleprojetrw2edinjectiondevapeurahautepression AT holtamvr schoonebeekoilfieldtherw2ehighpressuresteaminjectionprojectgisementdeschoonebeekleprojetrw2edinjectiondevapeurahautepression AT vandenboermj schoonebeekoilfieldtherw2ehighpressuresteaminjectionprojectgisementdeschoonebeekleprojetrw2edinjectiondevapeurahautepression AT platenkamprj schoonebeekoilfieldtherw2ehighpressuresteaminjectionprojectgisementdeschoonebeekleprojetrw2edinjectiondevapeurahautepression |
_version_ |
1724235738482999296 |