Cost-effective infrastructure choices in education: Location, build or repair
The purpose of this study is to develop a model to arrive at a joint optimising strategy for capital budgeting for the construction of new school buildings and for the renovation of existing schools. This model provides a practical tool for ranking construction projects so as to yield the maximum po...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
AOSIS
2015-03-01
|
Series: | South African Journal of Economic and Management Sciences |
Online Access: | https://sajems.org/index.php/sajems/article/view/818 |
id |
doaj-2d524b3244e941cb83e5a51ded5c721a |
---|---|
record_format |
Article |
spelling |
doaj-2d524b3244e941cb83e5a51ded5c721a2020-11-24T22:30:34ZengAOSISSouth African Journal of Economic and Management Sciences1015-88122222-34362015-03-01181708310.4102/sajems.v18i1.818411Cost-effective infrastructure choices in education: Location, build or repairGlenn P JenkinsArmin ZeinaliThe purpose of this study is to develop a model to arrive at a joint optimising strategy for capital budgeting for the construction of new school buildings and for the renovation of existing schools. This model provides a practical tool for ranking construction projects so as to yield the maximum positive impact on the education system. A key aspect of the model is that it provides the optimal mix of renovation and new construction that should be undertaken under a fixed budget constraint.The model is applied to a sample dataset from the education sector of Limpopo province, South Africa, in order to quantify the benefits of using the model. The benefits from using this model for decision making on the evaluation of new and renovation investments in school infrastructure is estimated to increase the effectiveness of these investments by up to 300 percent over the counterfactual system for making these decisions.https://sajems.org/index.php/sajems/article/view/818 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Glenn P Jenkins Armin Zeinali |
spellingShingle |
Glenn P Jenkins Armin Zeinali Cost-effective infrastructure choices in education: Location, build or repair South African Journal of Economic and Management Sciences |
author_facet |
Glenn P Jenkins Armin Zeinali |
author_sort |
Glenn P Jenkins |
title |
Cost-effective infrastructure choices in education: Location, build or repair |
title_short |
Cost-effective infrastructure choices in education: Location, build or repair |
title_full |
Cost-effective infrastructure choices in education: Location, build or repair |
title_fullStr |
Cost-effective infrastructure choices in education: Location, build or repair |
title_full_unstemmed |
Cost-effective infrastructure choices in education: Location, build or repair |
title_sort |
cost-effective infrastructure choices in education: location, build or repair |
publisher |
AOSIS |
series |
South African Journal of Economic and Management Sciences |
issn |
1015-8812 2222-3436 |
publishDate |
2015-03-01 |
description |
The purpose of this study is to develop a model to arrive at a joint optimising strategy for capital budgeting for the construction of new school buildings and for the renovation of existing schools. This model provides a practical tool for ranking construction projects so as to yield the maximum positive impact on the education system. A key aspect of the model is that it provides the optimal mix of renovation and new construction that should be undertaken under a fixed budget constraint.The model is applied to a sample dataset from the education sector of Limpopo province, South Africa, in order to quantify the benefits of using the model. The benefits from using this model for decision making on the evaluation of new and renovation investments in school infrastructure is estimated to increase the effectiveness of these investments by up to 300 percent over the counterfactual system for making these decisions. |
url |
https://sajems.org/index.php/sajems/article/view/818 |
work_keys_str_mv |
AT glennpjenkins costeffectiveinfrastructurechoicesineducationlocationbuildorrepair AT arminzeinali costeffectiveinfrastructurechoicesineducationlocationbuildorrepair |
_version_ |
1725740252362964992 |