New Structure of Governor Electrohydraulic Power which meets the Requirements of the Implemented LFC-System
The construction and operation of a control system of a power unit turboset has been described. The controllers use the CWP (Current Work Point) signal from the ACFP (Automatic Control Frequency and Power) system. Such an installation has been made on a power unit in a Power Plant. The control syst...
Main Authors: | Mariusz Pawlak, Jacek Karczewski |
---|---|
Format: | Article |
Language: | English |
Published: |
ENERGA SA
2014-03-01
|
Series: | Acta Energetica |
Subjects: | |
Online Access: | http://actaenergetica.org/en/articles/acta-energetica-012014/new-structure-of-governor-electrohydraulic-power-which-meets-the-requirements-of-the-implemented-lfc-system/ |
Similar Items
-
THE DEVELOPMENT OF PROTECTION SYSTEMS OF STEAM TURBINES IN THE IMPLEMENTATION OF ELECTROHYDRAULIC CONTROL SYSTEMS
by: V. B. Novoselov, et al.
Published: (2017-12-01) -
Tasks of Russian engine building in meeting current and future marine power requirements
by: Roman A. Ivanov, et al.
Published: (2019-04-01) -
The Influence of Hydraulic lay out on the Performances of the Hydraulic Turbine from HPP Raul Alb
by: Adrian Cuzmos, et al.
Published: (2013-05-01) -
Verification of turbine and governor model of hydro generator unit for the purpose of load frequency control system simulation
by: Džepčeski Dane, et al.
Published: (2015-01-01) -
Energy Efficiency of Power Plants: the Potential of Automatic Transmissions to Meet New International Requirements
by: Leonid G. Krasnevskiy
Published: (2017-12-01)