New Structure of Governor Electrohydraulic Power which meets the Requirements of the Implemented LFC-System
The construction and operation of a control system of a power unit turboset has been described. The controllers use the CWP (Current Work Point) signal from the ACFP (Automatic Control Frequency and Power) system. Such an installation has been made on a power unit in a Power Plant. The control syst...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
ENERGA SA
2014-03-01
|
Series: | Acta Energetica |
Subjects: | |
Online Access: | http://actaenergetica.org/en/articles/acta-energetica-012014/new-structure-of-governor-electrohydraulic-power-which-meets-the-requirements-of-the-implemented-lfc-system/ |