Mathematical modeling of stress-strain state of the system HPP building - soil base with account for the phased construction of the building

The interaction process of a power plant building with the soil base is studied basing on mathematical modeling of the construction process of Kambarata-2 HPP, taking into account the excavation of foundation pit, the concreting schedule of the building construction, the HPP units putting into opera...

Full description

Bibliographic Details
Main Author: Orekhov Vyacheslav Valentinovich
Format: Article
Language:English
Published: Moscow State University of Civil Engineering (MGSU)
Series:Vestnik MGSU
Subjects:
Online Access:http://vestnikmgsu.ru/files/archive/issues/2014/12/ru/11.pdf
id doaj-2cc59ec02b0e48d6bdfdac127b339f32
record_format Article
spelling doaj-2cc59ec02b0e48d6bdfdac127b339f322020-11-24T22:45:34ZengMoscow State University of Civil Engineering (MGSU)Vestnik MGSU 1997-093512113120Mathematical modeling of stress-strain state of the system HPP building - soil base with account for the phased construction of the buildingOrekhov Vyacheslav Valentinovich0Moscow State University of Civil Engineering (MGSU)The interaction process of a power plant building with the soil base is studied basing on mathematical modeling of the construction process of Kambarata-2 HPP, taking into account the excavation of foundation pit, the concreting schedule of the building construction, the HPP units putting into operation and territory planning. Mathematical modeling of stress-strain state of the system “power plant - soil base” in the process of construction was performed by using the computer program “Zemlya” (the Earth), which implements the method of finite elements. Such a behavior of soil was described using elastoplastic soil model, the parameters of which were determined from the results of the triaxial tests. As shown by the results of the research, the continuous change of settlement, slope, deflection and torsion of the bottom plate and accordingly change of stressed-strained state of power plant are noted during the construction process. The installed HPP construction schedule, starting from the construction of the first block and the adjacent mounting platform, is leading to the formation of initial roll of bottom plate to the path of the mounting pad. In the process of further construction of powerhouse, up to the 29th phase of construction (out of 40), a steady increase in its subsidence (maximum values of about 4.5 cm) is noted. Filling of foundation pit hollows and territorial planning of the construction area lead to drastic situation. In this case, as a territory planning points exceeded the relief, the plastic deformation in the soil evolves, resulting in significant subsidence of the bottom plate under the first block (up to 7.4 cm). As a result, the additional subsidence of the soil of bottom plate edges lead to the large vertical movement in relation to its central part and it is bent around the X axis, resulting in a large horizontal tensile stress values of Sz (up to 2.17 MPa) in the constructive elements of the upper part of the powerhouse. At the same time, the calculations performed on the assumption of instantaneous power plant construction forecast only a uniform slope of bottom plate in the direction of the headwater and do not allow us to track the process of stress-strain state of the power plant for adequate reinforcement of its elements.http://vestnikmgsu.ru/files/archive/issues/2014/12/ru/11.pdfphased constructionsettlement of the bottom platehydro power plantnumerical simulationstress-strain statesoil foundation
collection DOAJ
language English
format Article
sources DOAJ
author Orekhov Vyacheslav Valentinovich
spellingShingle Orekhov Vyacheslav Valentinovich
Mathematical modeling of stress-strain state of the system HPP building - soil base with account for the phased construction of the building
Vestnik MGSU
phased construction
settlement of the bottom plate
hydro power plant
numerical simulation
stress-strain state
soil foundation
author_facet Orekhov Vyacheslav Valentinovich
author_sort Orekhov Vyacheslav Valentinovich
title Mathematical modeling of stress-strain state of the system HPP building - soil base with account for the phased construction of the building
title_short Mathematical modeling of stress-strain state of the system HPP building - soil base with account for the phased construction of the building
title_full Mathematical modeling of stress-strain state of the system HPP building - soil base with account for the phased construction of the building
title_fullStr Mathematical modeling of stress-strain state of the system HPP building - soil base with account for the phased construction of the building
title_full_unstemmed Mathematical modeling of stress-strain state of the system HPP building - soil base with account for the phased construction of the building
title_sort mathematical modeling of stress-strain state of the system hpp building - soil base with account for the phased construction of the building
publisher Moscow State University of Civil Engineering (MGSU)
series Vestnik MGSU
issn 1997-0935
description The interaction process of a power plant building with the soil base is studied basing on mathematical modeling of the construction process of Kambarata-2 HPP, taking into account the excavation of foundation pit, the concreting schedule of the building construction, the HPP units putting into operation and territory planning. Mathematical modeling of stress-strain state of the system “power plant - soil base” in the process of construction was performed by using the computer program “Zemlya” (the Earth), which implements the method of finite elements. Such a behavior of soil was described using elastoplastic soil model, the parameters of which were determined from the results of the triaxial tests. As shown by the results of the research, the continuous change of settlement, slope, deflection and torsion of the bottom plate and accordingly change of stressed-strained state of power plant are noted during the construction process. The installed HPP construction schedule, starting from the construction of the first block and the adjacent mounting platform, is leading to the formation of initial roll of bottom plate to the path of the mounting pad. In the process of further construction of powerhouse, up to the 29th phase of construction (out of 40), a steady increase in its subsidence (maximum values of about 4.5 cm) is noted. Filling of foundation pit hollows and territorial planning of the construction area lead to drastic situation. In this case, as a territory planning points exceeded the relief, the plastic deformation in the soil evolves, resulting in significant subsidence of the bottom plate under the first block (up to 7.4 cm). As a result, the additional subsidence of the soil of bottom plate edges lead to the large vertical movement in relation to its central part and it is bent around the X axis, resulting in a large horizontal tensile stress values of Sz (up to 2.17 MPa) in the constructive elements of the upper part of the powerhouse. At the same time, the calculations performed on the assumption of instantaneous power plant construction forecast only a uniform slope of bottom plate in the direction of the headwater and do not allow us to track the process of stress-strain state of the power plant for adequate reinforcement of its elements.
topic phased construction
settlement of the bottom plate
hydro power plant
numerical simulation
stress-strain state
soil foundation
url http://vestnikmgsu.ru/files/archive/issues/2014/12/ru/11.pdf
work_keys_str_mv AT orekhovvyacheslavvalentinovich mathematicalmodelingofstressstrainstateofthesystemhppbuildingsoilbasewithaccountforthephasedconstructionofthebuilding
_version_ 1725687946984554496