Research on the construction ventilation scheme of concealed subway station
With the development of underground transportation, in order to reduce the impact on the surrounding environment and traffic, Hejiaying subway island station adopts the concealed excavation method. During the construction process, considering the construction method, tunnel layout, ventilation requi...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/59/e3sconf_iccaue2021_01021.pdf |
id |
doaj-2bcabc3c9c5a4150ab9960033f45ae54 |
---|---|
record_format |
Article |
spelling |
doaj-2bcabc3c9c5a4150ab9960033f45ae542021-07-08T07:08:04ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012830102110.1051/e3sconf/202128301021e3sconf_iccaue2021_01021Research on the construction ventilation scheme of concealed subway stationWang Chen0Zhao Jian-hui1Li Ze-hua2Chen Jia-mei3Liu Pan-xue4College of Energy Engineering. Xi’an University Of Science And TechnologyCollege of Energy Engineering. Xi’an University Of Science And TechnologyCollege of Architecture and Civil Engineering. Xi`an University Of Science And TechnologyCollege of Energy Engineering. Xi’an University Of Science And TechnologyCollege of Energy Engineering. Xi’an University Of Science And TechnologyWith the development of underground transportation, in order to reduce the impact on the surrounding environment and traffic, Hejiaying subway island station adopts the concealed excavation method. During the construction process, considering the construction method, tunnel layout, ventilation requirements, and the construction working face as a multi-conductor cave, more stringent requirements are put forward for the construction ventilation of the tunnel. Through the combination of theoretical calculation and numerical simulation, a ventilation method suitable for the actual construction conditions at the site was developed. After applying the scheme to practice, the feasibility of the scheme was verified through the determination of field data, and the improvement of the construction environment for tunnel personnel was achieved, which has certain reference value for similar projects.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/59/e3sconf_iccaue2021_01021.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Wang Chen Zhao Jian-hui Li Ze-hua Chen Jia-mei Liu Pan-xue |
spellingShingle |
Wang Chen Zhao Jian-hui Li Ze-hua Chen Jia-mei Liu Pan-xue Research on the construction ventilation scheme of concealed subway station E3S Web of Conferences |
author_facet |
Wang Chen Zhao Jian-hui Li Ze-hua Chen Jia-mei Liu Pan-xue |
author_sort |
Wang Chen |
title |
Research on the construction ventilation scheme of concealed subway station |
title_short |
Research on the construction ventilation scheme of concealed subway station |
title_full |
Research on the construction ventilation scheme of concealed subway station |
title_fullStr |
Research on the construction ventilation scheme of concealed subway station |
title_full_unstemmed |
Research on the construction ventilation scheme of concealed subway station |
title_sort |
research on the construction ventilation scheme of concealed subway station |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2021-01-01 |
description |
With the development of underground transportation, in order to reduce the impact on the surrounding environment and traffic, Hejiaying subway island station adopts the concealed excavation method. During the construction process, considering the construction method, tunnel layout, ventilation requirements, and the construction working face as a multi-conductor cave, more stringent requirements are put forward for the construction ventilation of the tunnel. Through the combination of theoretical calculation and numerical simulation, a ventilation method suitable for the actual construction conditions at the site was developed. After applying the scheme to practice, the feasibility of the scheme was verified through the determination of field data, and the improvement of the construction environment for tunnel personnel was achieved, which has certain reference value for similar projects. |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/59/e3sconf_iccaue2021_01021.pdf |
work_keys_str_mv |
AT wangchen researchontheconstructionventilationschemeofconcealedsubwaystation AT zhaojianhui researchontheconstructionventilationschemeofconcealedsubwaystation AT lizehua researchontheconstructionventilationschemeofconcealedsubwaystation AT chenjiamei researchontheconstructionventilationschemeofconcealedsubwaystation AT liupanxue researchontheconstructionventilationschemeofconcealedsubwaystation |
_version_ |
1721313891234873344 |