ITERATIVE POWER MAXIMIZATION BY ONE-HALF COST DICHOTOMY FOR OPTIMIZING WIND FARM DEPLOYMENT
Background. In deploying a wind farm, it is important to hold a balance of energy generated by wind turbines and costs spent on buying and installing them. However, ranking the energy and costs is commonly uncertain. Besides, the existing methods of optimal wind farm deployment are pretty slow, wher...
Main Author: | Vadim V. Romanuke |
---|---|
Format: | Article |
Language: | English |
Published: |
Igor Sikorsky Kyiv Polytechnic Institute
2019-10-01
|
Series: | KPI Science News |
Subjects: | |
Online Access: | http://scinews.kpi.ua/article/view/177315 |
Similar Items
-
A Review on State-of-the-Art Reviews in Wind-Turbine- and Wind-Farm-Related Topics
by: Manisha Sawant, et al.
Published: (2021-04-01) -
Feasibility study of an integrated wind and solar farm by evaluating the wind turbine shadows
by: Shanghavi, Sahil
Published: (2012) -
Vlasina wind project: Results and perspectives
by: Raković Radoslav M.
Published: (2006-01-01) -
Benchmarking of Optimization Modules for Two Wind Farm Design Software Tools
by: Yilmaz, Eftun
Published: (2012) -
DEVELOPMENT OF WIND ENERGY COMPLEX AUTOMATION SYSTEM
by: Kuanysh Mussilimov, et al.
Published: (2019-06-01)