Managing the exploitation life of the mining machinery for an unlimited duration of time
The problem of determining the optimum exploitation life of machinery, namely, the optimum time for machinery and equipment replacement, represents a complex and highly responsible engineering task. Taking into consideration the situation prevailing at coal pit mines in Serbia, the tasks of this...
Main Authors: | , , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Belgrade
2011-01-01
|
Series: | Yugoslav Journal of Operations Research |
Subjects: | |
Online Access: | http://www.doiserbia.nb.rs/img/doi/0354-0243/2011/0354-02431101137V.pdf |
id |
doaj-2b0ee321352a492fbd055e4c1d9aa9a7 |
---|---|
record_format |
Article |
spelling |
doaj-2b0ee321352a492fbd055e4c1d9aa9a72020-11-24T22:44:02ZengUniversity of BelgradeYugoslav Journal of Operations Research0354-02431820-743X2011-01-0121113714910.2298/YJOR1101137VManaging the exploitation life of the mining machinery for an unlimited duration of timeVujić SlobodanStanojević RadoslavIvanov VencislavZajić BorislavMiljanović IgorMaksimović SvetomirBoševski StefkoBenović TomoHudej MarjanThe problem of determining the optimum exploitation life of machinery, namely, the optimum time for machinery and equipment replacement, represents a complex and highly responsible engineering task. Taking into consideration the situation prevailing at coal pit mines in Serbia, the tasks of this rank are very complex and difficult. To make a decision on the replacement of capital equipment and machinery, such as bucket wheel excavators within the mentioned systems, implies a management task of utmost responsibility. It requires high professional and analytical knowledge as well as reliable arguments, based on a multidisciplinary professional approach. In this paper, the authors present their views on the problem of establishing the optimum exploitation life of bucket wheel excavators, offering an algorithm, based on dynamic programming, as a solution.http://www.doiserbia.nb.rs/img/doi/0354-0243/2011/0354-02431101137V.pdfBucket wheel excavatorsexploitation life of machineryoptimizationoperations researchtheory of replacementdynamic programming |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Vujić Slobodan Stanojević Radoslav Ivanov Vencislav Zajić Borislav Miljanović Igor Maksimović Svetomir Boševski Stefko Benović Tomo Hudej Marjan |
spellingShingle |
Vujić Slobodan Stanojević Radoslav Ivanov Vencislav Zajić Borislav Miljanović Igor Maksimović Svetomir Boševski Stefko Benović Tomo Hudej Marjan Managing the exploitation life of the mining machinery for an unlimited duration of time Yugoslav Journal of Operations Research Bucket wheel excavators exploitation life of machinery optimization operations research theory of replacement dynamic programming |
author_facet |
Vujić Slobodan Stanojević Radoslav Ivanov Vencislav Zajić Borislav Miljanović Igor Maksimović Svetomir Boševski Stefko Benović Tomo Hudej Marjan |
author_sort |
Vujić Slobodan |
title |
Managing the exploitation life of the mining machinery for an unlimited duration of time |
title_short |
Managing the exploitation life of the mining machinery for an unlimited duration of time |
title_full |
Managing the exploitation life of the mining machinery for an unlimited duration of time |
title_fullStr |
Managing the exploitation life of the mining machinery for an unlimited duration of time |
title_full_unstemmed |
Managing the exploitation life of the mining machinery for an unlimited duration of time |
title_sort |
managing the exploitation life of the mining machinery for an unlimited duration of time |
publisher |
University of Belgrade |
series |
Yugoslav Journal of Operations Research |
issn |
0354-0243 1820-743X |
publishDate |
2011-01-01 |
description |
The problem of determining the optimum exploitation life of machinery, namely, the optimum time for machinery and equipment replacement, represents a complex and highly responsible engineering task. Taking into consideration the situation prevailing at coal pit mines in Serbia, the tasks of this rank are very complex and difficult. To make a decision on the replacement of capital equipment and machinery, such as bucket wheel excavators within the mentioned systems, implies a management task of utmost responsibility. It requires high professional and analytical knowledge as well as reliable arguments, based on a multidisciplinary professional approach. In this paper, the authors present their views on the problem of establishing the optimum exploitation life of bucket wheel excavators, offering an algorithm, based on dynamic programming, as a solution. |
topic |
Bucket wheel excavators exploitation life of machinery optimization operations research theory of replacement dynamic programming |
url |
http://www.doiserbia.nb.rs/img/doi/0354-0243/2011/0354-02431101137V.pdf |
work_keys_str_mv |
AT vujicslobodan managingtheexploitationlifeoftheminingmachineryforanunlimiteddurationoftime AT stanojevicradoslav managingtheexploitationlifeoftheminingmachineryforanunlimiteddurationoftime AT ivanovvencislav managingtheexploitationlifeoftheminingmachineryforanunlimiteddurationoftime AT zajicborislav managingtheexploitationlifeoftheminingmachineryforanunlimiteddurationoftime AT miljanovicigor managingtheexploitationlifeoftheminingmachineryforanunlimiteddurationoftime AT maksimovicsvetomir managingtheexploitationlifeoftheminingmachineryforanunlimiteddurationoftime AT bosevskistefko managingtheexploitationlifeoftheminingmachineryforanunlimiteddurationoftime AT benovictomo managingtheexploitationlifeoftheminingmachineryforanunlimiteddurationoftime AT hudejmarjan managingtheexploitationlifeoftheminingmachineryforanunlimiteddurationoftime |
_version_ |
1725693236853342208 |