Managing the exploitation life of the mining machinery for an unlimited duration of time

The problem of determining the optimum exploitation life of machinery, namely, the optimum time for machinery and equipment replacement, represents a complex and highly responsible engineering task. Taking into consideration the situation prevailing at coal pit mines in Serbia, the tasks of this...

Full description

Bibliographic Details
Main Authors: Vujić Slobodan, Stanojević Radoslav, Ivanov Vencislav, Zajić Borislav, Miljanović Igor, Maksimović Svetomir, Boševski Stefko, Benović Tomo, Hudej Marjan
Format: Article
Language:English
Published: University of Belgrade 2011-01-01
Series:Yugoslav Journal of Operations Research
Subjects:
Online Access:http://www.doiserbia.nb.rs/img/doi/0354-0243/2011/0354-02431101137V.pdf
Description
Summary:The problem of determining the optimum exploitation life of machinery, namely, the optimum time for machinery and equipment replacement, represents a complex and highly responsible engineering task. Taking into consideration the situation prevailing at coal pit mines in Serbia, the tasks of this rank are very complex and difficult. To make a decision on the replacement of capital equipment and machinery, such as bucket wheel excavators within the mentioned systems, implies a management task of utmost responsibility. It requires high professional and analytical knowledge as well as reliable arguments, based on a multidisciplinary professional approach. In this paper, the authors present their views on the problem of establishing the optimum exploitation life of bucket wheel excavators, offering an algorithm, based on dynamic programming, as a solution.
ISSN:0354-0243
1820-743X