Technical condition of pre-war buildings in the face of new transport investments on the example of a townhouse from 1912

The subject of the paper is an analysis a new building investments impact on the already existing buildings in a tight, compact city construction. The problem was discussed in two ways in the paper. Firstly, by identifying a group of factors that are caused by a new construction investments which...

Full description

Bibliographic Details
Main Authors: Marek Dohojda, Katarzyna Jeleniewicz, Joanna Witkowska-Dobrev, Olga Szlachetka
Format: Article
Language:English
Published: Warsaw University of Life Sciences 2020-11-01
Series:Acta Scientiarum Polonorum. Architectura
Subjects:
Online Access:http://www.architectura.actapol.net/tom19/zeszyt3/19_3_3.pdf
Description
Summary:The subject of the paper is an analysis a new building investments impact on the already existing buildings in a tight, compact city construction. The problem was discussed in two ways in the paper. Firstly, by identifying a group of factors that are caused by a new construction investments which could effect on neighbouring objects. Secondly, by correct technical condition assessment of existing buildings, methods for improving it or using technologies, that are also aimed to minimising the neighbouring investments impact. The issue was discussed based on a pre-war building located in the Praga Północ District in Warsaw.
ISSN:1644-0633
2544-1760