Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assum...

Full description

Bibliographic Details
Main Authors: Zahedi Zahedi, Ashadi Salim
Format: Article
Language:English
Published: Bina Nusantara University 2016-06-01
Series:ComTech
Subjects:
Online Access:https://journal.binus.ac.id/index.php/comtech/article/view/2247
id doaj-29ade05307454d7286c08044ea727d91
record_format Article
spelling doaj-29ade05307454d7286c08044ea727d912020-11-25T02:14:46ZengBina Nusantara UniversityComTech2087-12442476-907X2016-06-017210511210.21512/comtech.v7i2.22471663Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production SchedulingZahedi Zahedi0Ashadi Salim1Bina Nusantara UniversityBina Nusantara UniversityThis paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run) up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.https://journal.binus.ac.id/index.php/comtech/article/view/2247integrated model, batch scheduling, maintenance scheduling, actual flow time, machine failure probability
collection DOAJ
language English
format Article
sources DOAJ
author Zahedi Zahedi
Ashadi Salim
spellingShingle Zahedi Zahedi
Ashadi Salim
Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling
ComTech
integrated model, batch scheduling, maintenance scheduling, actual flow time, machine failure probability
author_facet Zahedi Zahedi
Ashadi Salim
author_sort Zahedi Zahedi
title Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling
title_short Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling
title_full Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling
title_fullStr Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling
title_full_unstemmed Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling
title_sort integrating preventive maintenance scheduling as probability machine failure and batch production scheduling
publisher Bina Nusantara University
series ComTech
issn 2087-1244
2476-907X
publishDate 2016-06-01
description This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run) up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.
topic integrated model, batch scheduling, maintenance scheduling, actual flow time, machine failure probability
url https://journal.binus.ac.id/index.php/comtech/article/view/2247
work_keys_str_mv AT zahedizahedi integratingpreventivemaintenanceschedulingasprobabilitymachinefailureandbatchproductionscheduling
AT ashadisalim integratingpreventivemaintenanceschedulingasprobabilitymachinefailureandbatchproductionscheduling
_version_ 1724899822669922304