A Hybrid Cable Connection Structure for Wind Farms With Reliability Consideration
The collector system in wind farm has a large number of cables. When one of the cable fails, the power generated by the wind turbine (WT) cannot be collected into the substation through the faulty cable. That would make the profits for the wind farm reduced. Therefore, it is necessary to find a more...
Main Authors: | Junxian Li, Weihao Hu, Xiawei Wu, Qi Huang, Zhou Liu, Zhe Chen, Frede Blaabjerg |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2019-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/8854090/ |
Similar Items
-
Simultaneous Optimisation of Cable Connection Schemes and Capacity for Offshore Wind Farms via a Modified Bat Algorithm
by: Yuanhang Qi, et al.
Published: (2019-01-01) -
A review of offshore wind farm layout optimization and electrical system design methods
by: Peng Hou, et al.
Published: (2019-01-01) -
Wind Farm Cable Connection Layout Optimization with Several Substations
by: Adelaide Cerveira, et al.
Published: (2021-06-01) -
Optimization of Wind Turbine Interconnections in an Offshore Wind Farm Using Metaheuristic Algorithms
by: Chakib El Mokhi, et al.
Published: (2020-07-01) -
Towards negative cycle canceling in wind farm cable layout optimization
by: Sascha Gritzbach, et al.
Published: (2018-10-01)