MODEL PENENTUAN UKURAN LOT PRODUKSI DENGAN POLA PERMINTAAN BERFLUKTUASI

The purpose of this paper is to examine the impact of varying demand on the production lot size and the schedule of delivery in the integrated inventory system. This system is consisted of a single manufacturer as the supplier and a single buyer. Mostly, the problems on the economic lot size model a...

Full description

Bibliographic Details
Main Authors: Docki Saraswati, Andi Cakravastia, Bermawi P. Iskandar, A. Hakim Halim
Format: Article
Language:English
Published: Petra Christian University 2009-01-01
Series:Jurnal Teknik Industri
Subjects:
Online Access:http://puslit2.petra.ac.id/ejournal/index.php/ind/article/view/17682
id doaj-29107de2300a4e5aba9913a869a177f8
record_format Article
spelling doaj-29107de2300a4e5aba9913a869a177f82020-11-25T00:27:58ZengPetra Christian UniversityJurnal Teknik Industri1411-24852009-01-01112122–133MODEL PENENTUAN UKURAN LOT PRODUKSI DENGAN POLA PERMINTAAN BERFLUKTUASIDocki SaraswatiAndi CakravastiaBermawi P. IskandarA. Hakim HalimThe purpose of this paper is to examine the impact of varying demand on the production lot size and the schedule of delivery in the integrated inventory system. This system is consisted of a single manufacturer as the supplier and a single buyer. Mostly, the problems on the economic lot size model are assumed that demand is continuous with time. Actually, demand occurs are varying in time rather than continuously over the planning time horizon. In this case, the buyer has decided the amount of order for each period is varied, because of the changing market environment. The integrated inventory system model between a supplier and a buyer are developed and implemented under the condition with varied demand. Forward dynamic programming is implemented for searching the solution. The objective is to minimize the total cost, associated with a single product for a deterministic varying demand. Two conditions are examined here, i.e., the integrated model with uncapacitated and capacitated production system. The difference between these two models is in the constraints formulation. The capacity constraints will give higher total cost, especially if the setup cost higher than the holding cost. A numerical example is presented to illustrate the implementation of the solution algorithm. Abstract in Bahasa Indonesia: Pada makalah ini diteliti pengaruh permintaan yang berfluktuasi terhadap penentuan ukuran lot produksi dan jadwal pengiriman pada sistem persediaan terintegrasi, dengan total ongkos persediaan melibatkan sistem persediaan pemanufaktur dan pembeli secara bersama. Sistem terdiri atas pemanufaktur tunggal dan pembeli tunggal untuk pemesanan satu jenis produk.Umumnya permasalahan penentuan ukuran lot produksi memiliki asumsi bahwa permintaan bersifat kontinu terhadap waktu. Penentuan ukuran lot pada model integrasi sistem persediaan antara pemanufaktur dan pembeli dengan kondisi permintaan berfluktuatif bertujuan meminimasi total ongkos. Pencarian solusi penentuan ukuran lot produksi dengan permintaan berfluktuatif mempergunakan pendekatan forward dynamic programming. Adapun model integrasi yang dikemukakan mempertimbangkan dua kondisi, yaitu kondisi kapasitas produksi tidak terbatas dan kapasitas produksi terbatas. Perbedaan formulasi terletak pada kondisi pembatas yang digunakan. Hasil pengamatan menunjukkan bahwa apabila ongkos setup jauh lebih tinggi dari pada ongkos simpan, maka kondisi dengan mempertimbangkan kapasitas akan menghasilkan total ongkos yang lebih tinggi. Suatu contoh numerik diberikan sebagai ilustrasi dari algoritma yang diusulkan. Kata kunci: ukuran lot produksi, fluktuasi permintaan, jadwal pengiriman, integrasi pemanufaktur-pembeli, programa dinamis. http://puslit2.petra.ac.id/ejournal/index.php/ind/article/view/17682production lot sizevarying demandschedule of deliverymanufacturer-buyer integrationdynamic programming.
collection DOAJ
language English
format Article
sources DOAJ
author Docki Saraswati
Andi Cakravastia
Bermawi P. Iskandar
A. Hakim Halim
spellingShingle Docki Saraswati
Andi Cakravastia
Bermawi P. Iskandar
A. Hakim Halim
MODEL PENENTUAN UKURAN LOT PRODUKSI DENGAN POLA PERMINTAAN BERFLUKTUASI
Jurnal Teknik Industri
production lot size
varying demand
schedule of delivery
manufacturer-buyer integration
dynamic programming.
author_facet Docki Saraswati
Andi Cakravastia
Bermawi P. Iskandar
A. Hakim Halim
author_sort Docki Saraswati
title MODEL PENENTUAN UKURAN LOT PRODUKSI DENGAN POLA PERMINTAAN BERFLUKTUASI
title_short MODEL PENENTUAN UKURAN LOT PRODUKSI DENGAN POLA PERMINTAAN BERFLUKTUASI
title_full MODEL PENENTUAN UKURAN LOT PRODUKSI DENGAN POLA PERMINTAAN BERFLUKTUASI
title_fullStr MODEL PENENTUAN UKURAN LOT PRODUKSI DENGAN POLA PERMINTAAN BERFLUKTUASI
title_full_unstemmed MODEL PENENTUAN UKURAN LOT PRODUKSI DENGAN POLA PERMINTAAN BERFLUKTUASI
title_sort model penentuan ukuran lot produksi dengan pola permintaan berfluktuasi
publisher Petra Christian University
series Jurnal Teknik Industri
issn 1411-2485
publishDate 2009-01-01
description The purpose of this paper is to examine the impact of varying demand on the production lot size and the schedule of delivery in the integrated inventory system. This system is consisted of a single manufacturer as the supplier and a single buyer. Mostly, the problems on the economic lot size model are assumed that demand is continuous with time. Actually, demand occurs are varying in time rather than continuously over the planning time horizon. In this case, the buyer has decided the amount of order for each period is varied, because of the changing market environment. The integrated inventory system model between a supplier and a buyer are developed and implemented under the condition with varied demand. Forward dynamic programming is implemented for searching the solution. The objective is to minimize the total cost, associated with a single product for a deterministic varying demand. Two conditions are examined here, i.e., the integrated model with uncapacitated and capacitated production system. The difference between these two models is in the constraints formulation. The capacity constraints will give higher total cost, especially if the setup cost higher than the holding cost. A numerical example is presented to illustrate the implementation of the solution algorithm. Abstract in Bahasa Indonesia: Pada makalah ini diteliti pengaruh permintaan yang berfluktuasi terhadap penentuan ukuran lot produksi dan jadwal pengiriman pada sistem persediaan terintegrasi, dengan total ongkos persediaan melibatkan sistem persediaan pemanufaktur dan pembeli secara bersama. Sistem terdiri atas pemanufaktur tunggal dan pembeli tunggal untuk pemesanan satu jenis produk.Umumnya permasalahan penentuan ukuran lot produksi memiliki asumsi bahwa permintaan bersifat kontinu terhadap waktu. Penentuan ukuran lot pada model integrasi sistem persediaan antara pemanufaktur dan pembeli dengan kondisi permintaan berfluktuatif bertujuan meminimasi total ongkos. Pencarian solusi penentuan ukuran lot produksi dengan permintaan berfluktuatif mempergunakan pendekatan forward dynamic programming. Adapun model integrasi yang dikemukakan mempertimbangkan dua kondisi, yaitu kondisi kapasitas produksi tidak terbatas dan kapasitas produksi terbatas. Perbedaan formulasi terletak pada kondisi pembatas yang digunakan. Hasil pengamatan menunjukkan bahwa apabila ongkos setup jauh lebih tinggi dari pada ongkos simpan, maka kondisi dengan mempertimbangkan kapasitas akan menghasilkan total ongkos yang lebih tinggi. Suatu contoh numerik diberikan sebagai ilustrasi dari algoritma yang diusulkan. Kata kunci: ukuran lot produksi, fluktuasi permintaan, jadwal pengiriman, integrasi pemanufaktur-pembeli, programa dinamis.
topic production lot size
varying demand
schedule of delivery
manufacturer-buyer integration
dynamic programming.
url http://puslit2.petra.ac.id/ejournal/index.php/ind/article/view/17682
work_keys_str_mv AT dockisaraswati modelpenentuanukuranlotproduksidenganpolapermintaanberfluktuasi
AT andicakravastia modelpenentuanukuranlotproduksidenganpolapermintaanberfluktuasi
AT bermawipiskandar modelpenentuanukuranlotproduksidenganpolapermintaanberfluktuasi
AT ahakimhalim modelpenentuanukuranlotproduksidenganpolapermintaanberfluktuasi
_version_ 1725337511098580992