A computer-based renewable resource management system for a construction company
The basic operation of a construction company involves the execution of tasks (building structures or building works) on sites. These projects are linked by the common resources of a building company used for the execution of different orders. The scheduling of a construction company programme is a...
Main Author: | Biruk Sławomir |
---|---|
Format: | Article |
Language: | English |
Published: |
De Gruyter
2018-11-01
|
Series: | Open Engineering |
Online Access: | https://doi.org/10.1515/eng-2018-0062 |
Similar Items
-
Reducing renewable resource demand fluctuation using soft precedence relations in project scheduling
by: Piotr Jaskowski, et al.
Published: (2018-07-01) -
Simulation model for resource-constrained construction project
by: Biruk Sławomir, et al.
Published: (2019-07-01) -
A Simulation Model of Construction Projects Executed in Random Conditions with the Overlapping Construction Works
by: Sławomir Biruk, et al.
Published: (2021-05-01) -
Resilience and management of stochastic renewable resource system
by: Tinch, Robert R. T.
Published: (2001) -
Scheduling Linear Construction Projects with Constraints on Resource Availability
by: Biruk S., et al.
Published: (2017-03-01)