Active Power Control Simulation Platform Research of Wind Farm Based on Multi-Agent
The realization of the automation, routinization and intelligentization of dispatch control in wind farms is the key to the integration of wind farms into power grid management system. Active power regulate and control system in wind farms has increasingly high demand on timeliness, but at present t...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2015-01-01
|
Series: | MATEC Web of Conferences |
Subjects: | |
Online Access: | http://dx.doi.org/10.1051/matecconf/20152202004 |
id |
doaj-27f2daaa6f7a41de8e8bdfcfcb815872 |
---|---|
record_format |
Article |
spelling |
doaj-27f2daaa6f7a41de8e8bdfcfcb8158722021-02-02T04:16:44ZengEDP SciencesMATEC Web of Conferences2261-236X2015-01-01220200410.1051/matecconf/20152202004matecconf_iceta2015_02004Active Power Control Simulation Platform Research of Wind Farm Based on Multi-AgentLiu XingjieWang KangyuanThe realization of the automation, routinization and intelligentization of dispatch control in wind farms is the key to the integration of wind farms into power grid management system. Active power regulate and control system in wind farms has increasingly high demand on timeliness, but at present this system is mostly equipped with centralized unidirectional control with poor timeliness and low utilization ratio for wind energy resources. The characteristics of distribution and instantaneity owned by the active power regulate and control system in wind farms are highly consistent with Multi-Agent system. This paper discusses a kind of processing method that is used in real-time, distributed and parallel computation and processing for multiple simultaneously running wind turbines, which is based on Multi-Agent technology and adopting JADE development platform. This method converts massive centralized computation to distributed computation, which optimizes the effect of the power control. This method makes the effectiveness of active power regulate and control system better, wins time for timely allocating electricity generation assignments and dealing with problems, and avoids the heavy loss of resources.http://dx.doi.org/10.1051/matecconf/20152202004Multi-Agent systemactive poweroptimized regulate and controlinstantaneitydistribution |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Liu Xingjie Wang Kangyuan |
spellingShingle |
Liu Xingjie Wang Kangyuan Active Power Control Simulation Platform Research of Wind Farm Based on Multi-Agent MATEC Web of Conferences Multi-Agent system active power optimized regulate and control instantaneity distribution |
author_facet |
Liu Xingjie Wang Kangyuan |
author_sort |
Liu Xingjie |
title |
Active Power Control Simulation Platform Research of Wind Farm Based on Multi-Agent |
title_short |
Active Power Control Simulation Platform Research of Wind Farm Based on Multi-Agent |
title_full |
Active Power Control Simulation Platform Research of Wind Farm Based on Multi-Agent |
title_fullStr |
Active Power Control Simulation Platform Research of Wind Farm Based on Multi-Agent |
title_full_unstemmed |
Active Power Control Simulation Platform Research of Wind Farm Based on Multi-Agent |
title_sort |
active power control simulation platform research of wind farm based on multi-agent |
publisher |
EDP Sciences |
series |
MATEC Web of Conferences |
issn |
2261-236X |
publishDate |
2015-01-01 |
description |
The realization of the automation, routinization and intelligentization of dispatch control in wind farms is the key to the integration of wind farms into power grid management system. Active power regulate and control system in wind farms has increasingly high demand on timeliness, but at present this system is mostly equipped with centralized unidirectional control with poor timeliness and low utilization ratio for wind energy resources. The characteristics of distribution and instantaneity owned by the active power regulate and control system in wind farms are highly consistent with Multi-Agent system. This paper discusses a kind of processing method that is used in real-time, distributed and parallel computation and processing for multiple simultaneously running wind turbines, which is based on Multi-Agent technology and adopting JADE development platform. This method converts massive centralized computation to distributed computation, which optimizes the effect of the power control. This method makes the effectiveness of active power regulate and control system better, wins time for timely allocating electricity generation assignments and dealing with problems, and avoids the heavy loss of resources. |
topic |
Multi-Agent system active power optimized regulate and control instantaneity distribution |
url |
http://dx.doi.org/10.1051/matecconf/20152202004 |
work_keys_str_mv |
AT liuxingjie activepowercontrolsimulationplatformresearchofwindfarmbasedonmultiagent AT wangkangyuan activepowercontrolsimulationplatformresearchofwindfarmbasedonmultiagent |
_version_ |
1724306063064301568 |