Phase Planning for Open Pit Coal Mines through Nested Pit Generation and Dynamic Programming
This paper presents a phase planning method specially designed for coal deposits with nearly horizontal, bedded coal seams. The geology of this type of deposit is modeled into a column model, instead of a block model, to avoid coal-rock mixing in blocks. A nested pit generation algorithm is develope...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2021-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/8219431 |
id |
doaj-277077b3ddad41159fc7c1c2263120d2 |
---|---|
record_format |
Article |
spelling |
doaj-277077b3ddad41159fc7c1c2263120d22021-02-22T00:01:33ZengHindawi LimitedMathematical Problems in Engineering1563-51472021-01-01202110.1155/2021/8219431Phase Planning for Open Pit Coal Mines through Nested Pit Generation and Dynamic ProgrammingXiaowei Gu0Qing Wang1Xiaochuan Xu2Xiaoqian Ma3College of Resources and Civil EngineeringCollege of Resources and Civil EngineeringCollege of Resources and Civil EngineeringCollege of Resources and Civil EngineeringThis paper presents a phase planning method specially designed for coal deposits with nearly horizontal, bedded coal seams. The geology of this type of deposit is modeled into a column model, instead of a block model, to avoid coal-rock mixing in blocks. A nested pit generation algorithm is developed for producing a series of nested, least-strip ratio pits with a column model as its input. The algorithm completely overcomes the troublesome gap problem. Taking the least-strip ratio pits as possible phase states, a dynamic programming formulation is proposed to simultaneously optimize the number of phases, the phase-pits, and the ultimate pit, with an objective of maximizing the net present value. The merits and capability of the proposed method are demonstrated through a case study on a large coal deposit.http://dx.doi.org/10.1155/2021/8219431 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Xiaowei Gu Qing Wang Xiaochuan Xu Xiaoqian Ma |
spellingShingle |
Xiaowei Gu Qing Wang Xiaochuan Xu Xiaoqian Ma Phase Planning for Open Pit Coal Mines through Nested Pit Generation and Dynamic Programming Mathematical Problems in Engineering |
author_facet |
Xiaowei Gu Qing Wang Xiaochuan Xu Xiaoqian Ma |
author_sort |
Xiaowei Gu |
title |
Phase Planning for Open Pit Coal Mines through Nested Pit Generation and Dynamic Programming |
title_short |
Phase Planning for Open Pit Coal Mines through Nested Pit Generation and Dynamic Programming |
title_full |
Phase Planning for Open Pit Coal Mines through Nested Pit Generation and Dynamic Programming |
title_fullStr |
Phase Planning for Open Pit Coal Mines through Nested Pit Generation and Dynamic Programming |
title_full_unstemmed |
Phase Planning for Open Pit Coal Mines through Nested Pit Generation and Dynamic Programming |
title_sort |
phase planning for open pit coal mines through nested pit generation and dynamic programming |
publisher |
Hindawi Limited |
series |
Mathematical Problems in Engineering |
issn |
1563-5147 |
publishDate |
2021-01-01 |
description |
This paper presents a phase planning method specially designed for coal deposits with nearly horizontal, bedded coal seams. The geology of this type of deposit is modeled into a column model, instead of a block model, to avoid coal-rock mixing in blocks. A nested pit generation algorithm is developed for producing a series of nested, least-strip ratio pits with a column model as its input. The algorithm completely overcomes the troublesome gap problem. Taking the least-strip ratio pits as possible phase states, a dynamic programming formulation is proposed to simultaneously optimize the number of phases, the phase-pits, and the ultimate pit, with an objective of maximizing the net present value. The merits and capability of the proposed method are demonstrated through a case study on a large coal deposit. |
url |
http://dx.doi.org/10.1155/2021/8219431 |
work_keys_str_mv |
AT xiaoweigu phaseplanningforopenpitcoalminesthroughnestedpitgenerationanddynamicprogramming AT qingwang phaseplanningforopenpitcoalminesthroughnestedpitgenerationanddynamicprogramming AT xiaochuanxu phaseplanningforopenpitcoalminesthroughnestedpitgenerationanddynamicprogramming AT xiaoqianma phaseplanningforopenpitcoalminesthroughnestedpitgenerationanddynamicprogramming |
_version_ |
1714853018898268160 |