Research on Optimization of Linkage Operation of Integrated Energy System in Industrial Parks based on Chaotic Particle Swarm Algorithm
Industrial parks cover a variety of production capacities and energy-consuming entities, with large load demand and complex energy-using structure, and common problems such as low energy utilization efficiency and unreasonable energy structure. The construction of an integrated energy system (IES) w...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/21/e3sconf_aeecs2021_01052.pdf |
id |
doaj-276088a5c97a4b56ae34ba3cdd335a8a |
---|---|
record_format |
Article |
spelling |
doaj-276088a5c97a4b56ae34ba3cdd335a8a2021-05-04T12:17:01ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012450105210.1051/e3sconf/202124501052e3sconf_aeecs2021_01052Research on Optimization of Linkage Operation of Integrated Energy System in Industrial Parks based on Chaotic Particle Swarm AlgorithmYang Yang0Hu Mengjin1Wei Mengju2Wang YongliZhou MinhanMa YuzeEnergy Development Research Department, State Grid Hebei Economic Research InstituteEnergy Development Research Department, State Grid Hebei Economic Research InstituteEnergy Development Research Department, State Grid Hebei Economic Research InstituteIndustrial parks cover a variety of production capacities and energy-consuming entities, with large load demand and complex energy-using structure, and common problems such as low energy utilization efficiency and unreasonable energy structure. The construction of an integrated energy system (IES) with a combined cooling, heating and power system as the core unit in the industrial park is of great significance for achieving reliable, efficient and clean energy use in the park. Therefore, this article is based on the integrated energy system of the industrial park, aims at the lowest total cost of park operators, and considers the constraints of grid node balance, equipment output and energy storage equipment, and constructs source-grid-load-storage linkage operation optimization model, and build a chaotic particle swarm algorithm (CPSO) to solve the model. Finally, a typical industrial park in my country is taken as an example to analyze the scientificity of the model.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/21/e3sconf_aeecs2021_01052.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Yang Yang Hu Mengjin Wei Mengju Wang Yongli Zhou Minhan Ma Yuze |
spellingShingle |
Yang Yang Hu Mengjin Wei Mengju Wang Yongli Zhou Minhan Ma Yuze Research on Optimization of Linkage Operation of Integrated Energy System in Industrial Parks based on Chaotic Particle Swarm Algorithm E3S Web of Conferences |
author_facet |
Yang Yang Hu Mengjin Wei Mengju Wang Yongli Zhou Minhan Ma Yuze |
author_sort |
Yang Yang |
title |
Research on Optimization of Linkage Operation of Integrated Energy System in Industrial Parks based on Chaotic Particle Swarm Algorithm |
title_short |
Research on Optimization of Linkage Operation of Integrated Energy System in Industrial Parks based on Chaotic Particle Swarm Algorithm |
title_full |
Research on Optimization of Linkage Operation of Integrated Energy System in Industrial Parks based on Chaotic Particle Swarm Algorithm |
title_fullStr |
Research on Optimization of Linkage Operation of Integrated Energy System in Industrial Parks based on Chaotic Particle Swarm Algorithm |
title_full_unstemmed |
Research on Optimization of Linkage Operation of Integrated Energy System in Industrial Parks based on Chaotic Particle Swarm Algorithm |
title_sort |
research on optimization of linkage operation of integrated energy system in industrial parks based on chaotic particle swarm algorithm |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2021-01-01 |
description |
Industrial parks cover a variety of production capacities and energy-consuming entities, with large load demand and complex energy-using structure, and common problems such as low energy utilization efficiency and unreasonable energy structure. The construction of an integrated energy system (IES) with a combined cooling, heating and power system as the core unit in the industrial park is of great significance for achieving reliable, efficient and clean energy use in the park. Therefore, this article is based on the integrated energy system of the industrial park, aims at the lowest total cost of park operators, and considers the constraints of grid node balance, equipment output and energy storage equipment, and constructs source-grid-load-storage linkage operation optimization model, and build a chaotic particle swarm algorithm (CPSO) to solve the model. Finally, a typical industrial park in my country is taken as an example to analyze the scientificity of the model. |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/21/e3sconf_aeecs2021_01052.pdf |
work_keys_str_mv |
AT yangyang researchonoptimizationoflinkageoperationofintegratedenergysysteminindustrialparksbasedonchaoticparticleswarmalgorithm AT humengjin researchonoptimizationoflinkageoperationofintegratedenergysysteminindustrialparksbasedonchaoticparticleswarmalgorithm AT weimengju researchonoptimizationoflinkageoperationofintegratedenergysysteminindustrialparksbasedonchaoticparticleswarmalgorithm AT wangyongli researchonoptimizationoflinkageoperationofintegratedenergysysteminindustrialparksbasedonchaoticparticleswarmalgorithm AT zhouminhan researchonoptimizationoflinkageoperationofintegratedenergysysteminindustrialparksbasedonchaoticparticleswarmalgorithm AT mayuze researchonoptimizationoflinkageoperationofintegratedenergysysteminindustrialparksbasedonchaoticparticleswarmalgorithm |
_version_ |
1721479267760472064 |