Preventing slips, overruns, and cancellations: Application of system accident investigations and theory to the understanding and prevention of engineering project failures.
Organizations that develop or operate complex engineering systems are plagued by systems engineering failures like schedule overruns, budget exceedances, and project cancellations. Unfortunately, there is not much actionable guidance on why these failures happen or how to prevent them. Our approach...
Main Authors: | Diane C Aloisio, Karen Marais |
---|---|
Format: | Article |
Language: | English |
Published: |
Public Library of Science (PLoS)
2020-01-01
|
Series: | PLoS ONE |
Online Access: | https://doi.org/10.1371/journal.pone.0229825 |
Similar Items
-
STATUS AND DEVELOPMENT OF RUNWAY OVERRUN PREVENTION SYSTEMS
by: A. V. Mozolyako, et al.
Published: (2016-11-01) -
The risk assessment of aircraft runway overrun accidents and incidents
by: Kirkland, Ian D.
Published: (2001) -
An Investigation of Project Dependencies and Risks in Project Schedule Slippage and Effort Overrun in the Engineering Computing Organization
by: Gozleveli, Farideh V.
Published: (2002) -
Estimation Of Cost Overrun Risk In Interrnational Project By Using Fuzzy Set Theory.
by: Han, Sedat
Published: (2005) -
Causes of Contractors' Cost Overruns in Construction Projects
by: WU,MENG-CONG, et al.
Published: (2019)