The Impact of Delays of Freight Trains in JIT System on Example One Track Line

The paper describes the problem between freight trains operated by Metrans Danube, a.s. and passenger trains operated by Regiojet, a.s on the line Bratislava – Dunajská Streda - Komárno. It is very important to emphasize this problem because, nowadays, mostly freight trains across the Europe drive i...

Full description

Bibliographic Details
Main Authors: Dlugoš Matúš, Pečený Lumír, Meško Pavol, Šulko Peter
Format: Article
Language:English
Published: EDP Sciences 2017-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201713400011
id doaj-2685734ee6b44da19785d0ec98b8cf6f
record_format Article
spelling doaj-2685734ee6b44da19785d0ec98b8cf6f2021-02-02T00:57:17ZengEDP SciencesMATEC Web of Conferences2261-236X2017-01-011340001110.1051/matecconf/201713400011matecconf_logi2017_00011The Impact of Delays of Freight Trains in JIT System on Example One Track LineDlugoš MatúšPečený LumírMeško PavolŠulko PeterThe paper describes the problem between freight trains operated by Metrans Danube, a.s. and passenger trains operated by Regiojet, a.s on the line Bratislava – Dunajská Streda - Komárno. It is very important to emphasize this problem because, nowadays, mostly freight trains across the Europe drive in just in time system, it means, that shipments are delivered at exact time and place on time. At this line there are many problems not only this track line is single track, so it is necessary to cross the trains very often in traffic points which maximum 2 traffic tracks but also organizing of transport is more complicated which is provided by Railway infrastructure manager – this case is very important example when railway traffic technology slows down all processes in the logistic chain.https://doi.org/10.1051/matecconf/201713400011
collection DOAJ
language English
format Article
sources DOAJ
author Dlugoš Matúš
Pečený Lumír
Meško Pavol
Šulko Peter
spellingShingle Dlugoš Matúš
Pečený Lumír
Meško Pavol
Šulko Peter
The Impact of Delays of Freight Trains in JIT System on Example One Track Line
MATEC Web of Conferences
author_facet Dlugoš Matúš
Pečený Lumír
Meško Pavol
Šulko Peter
author_sort Dlugoš Matúš
title The Impact of Delays of Freight Trains in JIT System on Example One Track Line
title_short The Impact of Delays of Freight Trains in JIT System on Example One Track Line
title_full The Impact of Delays of Freight Trains in JIT System on Example One Track Line
title_fullStr The Impact of Delays of Freight Trains in JIT System on Example One Track Line
title_full_unstemmed The Impact of Delays of Freight Trains in JIT System on Example One Track Line
title_sort impact of delays of freight trains in jit system on example one track line
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2017-01-01
description The paper describes the problem between freight trains operated by Metrans Danube, a.s. and passenger trains operated by Regiojet, a.s on the line Bratislava – Dunajská Streda - Komárno. It is very important to emphasize this problem because, nowadays, mostly freight trains across the Europe drive in just in time system, it means, that shipments are delivered at exact time and place on time. At this line there are many problems not only this track line is single track, so it is necessary to cross the trains very often in traffic points which maximum 2 traffic tracks but also organizing of transport is more complicated which is provided by Railway infrastructure manager – this case is very important example when railway traffic technology slows down all processes in the logistic chain.
url https://doi.org/10.1051/matecconf/201713400011
work_keys_str_mv AT dlugosmatus theimpactofdelaysoffreighttrainsinjitsystemonexampleonetrackline
AT pecenylumir theimpactofdelaysoffreighttrainsinjitsystemonexampleonetrackline
AT meskopavol theimpactofdelaysoffreighttrainsinjitsystemonexampleonetrackline
AT sulkopeter theimpactofdelaysoffreighttrainsinjitsystemonexampleonetrackline
AT dlugosmatus impactofdelaysoffreighttrainsinjitsystemonexampleonetrackline
AT pecenylumir impactofdelaysoffreighttrainsinjitsystemonexampleonetrackline
AT meskopavol impactofdelaysoffreighttrainsinjitsystemonexampleonetrackline
AT sulkopeter impactofdelaysoffreighttrainsinjitsystemonexampleonetrackline
_version_ 1724312583604797440