The Impact of Delays of Freight Trains in JIT System on Example One Track Line

The paper describes the problem between freight trains operated by Metrans Danube, a.s. and passenger trains operated by Regiojet, a.s on the line Bratislava – Dunajská Streda - Komárno. It is very important to emphasize this problem because, nowadays, mostly freight trains across the Europe drive i...

Full description

Bibliographic Details
Main Authors: Dlugoš Matúš, Pečený Lumír, Meško Pavol, Šulko Peter
Format: Article
Language:English
Published: EDP Sciences 2017-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201713400011
Description
Summary:The paper describes the problem between freight trains operated by Metrans Danube, a.s. and passenger trains operated by Regiojet, a.s on the line Bratislava – Dunajská Streda - Komárno. It is very important to emphasize this problem because, nowadays, mostly freight trains across the Europe drive in just in time system, it means, that shipments are delivered at exact time and place on time. At this line there are many problems not only this track line is single track, so it is necessary to cross the trains very often in traffic points which maximum 2 traffic tracks but also organizing of transport is more complicated which is provided by Railway infrastructure manager – this case is very important example when railway traffic technology slows down all processes in the logistic chain.
ISSN:2261-236X