Optimization of the hopper design parameters with a controlled technological process of loading, storage and unloading of bulk materials
The subject of the study is the process of loading capacities and bodies of vehicles to increase the usable volume and static load for further storage or transportation. Based on an analysis of the mechanization of loading operations at agricultural facilities related to the production, distribution...
Main Authors: | Prusov Maxim, Kurdyumov Vladimir, Pavlushin Andrey |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2020-01-01
|
Series: | BIO Web of Conferences |
Online Access: | https://www.bio-conferences.org/articles/bioconf/full_html/2020/11/bioconf_fies-20_00131/bioconf_fies-20_00131.html |
Similar Items
-
STUDY ON THE METHOD OF GRAIN HARVESTER HOPPER UNLOADING AND FULL HOPPER SIGNALLING USED
by: Galin Tihanov, et al.
Published: (2018-07-01) -
A study on the hopper unloading duration of the harvesting machine at different technical parameters
by: G. Tihanov
Published: (2020-06-01) -
STUDY ON THE EFFECT OF THE TYPE OF FULL HOPPER SIGNALLING USED IN GRAIN HARVESTERS ON THE TIME FOR THE GRAIN HOPPER UNLOADING
by: Galin Tihanov
Published: (2018-12-01) -
Application of the simulation of a tank capacity proposal for loading and unloading process of bulk material
by: Janka Šaderová, et al.
Published: (2012-12-01) -
Investigation of possibility of hopper cars unloading on the car dumper VRS–134M
by: Dovhaniuk Stepan, et al.
Published: (2019-01-01)