Multi-Item Production Lot Sizing with Postponement, External Source for Common Parts, and Adjustable Rate for End Products
This study considers a multi-item production lot-size problem incorporating postponement, an external source for common parts, and an adjustable-rate for end products. Dealing with product variety, timely requirements, and limited in-house capacity has led production managers to seek manufacturing s...
Main Authors: | Singa Wang Chiu, Hua Yao Wu, Tiffany Chiu, Yuan-Shyi Peter Chiu |
---|---|
Format: | Article |
Language: | English |
Published: |
International Journal of Mathematical, Engineering and Management Sciences
2021-06-01
|
Series: | International Journal of Mathematical, Engineering and Management Sciences |
Subjects: | |
Online Access: | https://www.ijmems.in/cms/storage/app/public/uploads/volumes/47-IJMEMS-20-150-6-3-787-804-2021.pdf |
Similar Items
-
The Collective Influence of Component Commonality, Adjustable-Rate, Postponement, and Rework on Multi-Item Manufacturing Decision
by: Singa Wang Chiu, et al.
Published: (2020-09-01) -
Combining the delayed differentiation policy and common parts' partial outsourcing strategy into a multi-item FPR-based system
by: Wang Chiu Singa, et al.
Published: (2020-01-01) -
A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance
by: Yuan-Shyi Peter Chiu, et al.
Published: (2020-06-01) -
Choosing The Right Postponement Strategy : A Focus On E-commerce and Postponement
by: Lindholm, Sofie, et al.
Published: (2012) -
Arbitrariness to postpone the hearing
by: Faris Ali Omar, et al.
Published: (2013-03-01)