An Empirical Study of Top Management Engagement in Total Quality Management: A Case of Pakistan’s Construction Industry
Top management obligation towards quality management is seen as one of the key factors in deciding its success. The local construction industry of Pakistan is far away from construction quality principles. In connection to this, the current study attempts to indicate the significance of quality...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Serbian Project Management Association - IPMA Serbia
2020-08-01
|
Series: | European Project Management Journal |
Subjects: | |
Online Access: | http://media.epmj.org/2020/09/2-Irfan.pdf |
id |
doaj-24b10d2d29cd48af90ee552f9cc5142b |
---|---|
record_format |
Article |
spelling |
doaj-24b10d2d29cd48af90ee552f9cc5142b2021-10-09T20:10:19ZengSerbian Project Management Association - IPMA SerbiaEuropean Project Management Journal2560-49612020-08-0110161910.18485/epmj.2020.10.1.2An Empirical Study of Top Management Engagement in Total Quality Management: A Case of Pakistan’s Construction IndustryMuhammad Irfan0Shafi Ullah1Maha Nadeem2Department of Civil Engineering, University of Lahore (Islamabad Campus), PakistanDepartment of Civil Engineering, University of Lahore (Islamabad Campus), PakistanDepartment of Construction Engineering and Management, National University of Sciences and Technology, Islamabad, PakistanTop management obligation towards quality management is seen as one of the key factors in deciding its success. The local construction industry of Pakistan is far away from construction quality principles. In connection to this, the current study attempts to indicate the significance of quality management of Pakistani construction industry from the perspective of top management engagement. The constructs were extracted from published literature based on top management engagement and investigated the top management’s engagement towards quality administration in the construction industry. Survey questionnaires were distributed among senior management from the construction organizations registered with Pakistan Engineering Counsel. From the results, it is demonstrated that top management is willing to adopt most of the constructs however, it is astonishing that the interest to incorporate quality management in cost and time perspectives is still lacking. Hence, the areas of quality are still a secondary consideration for most of the top management. Therefore, it is the need of hour that this attitude must be expanded to a more agreeable level. http://media.epmj.org/2020/09/2-Irfan.pdfqualityquality managementtop managementconstruction industry |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Muhammad Irfan Shafi Ullah Maha Nadeem |
spellingShingle |
Muhammad Irfan Shafi Ullah Maha Nadeem An Empirical Study of Top Management Engagement in Total Quality Management: A Case of Pakistan’s Construction Industry European Project Management Journal quality quality management top management construction industry |
author_facet |
Muhammad Irfan Shafi Ullah Maha Nadeem |
author_sort |
Muhammad Irfan |
title |
An Empirical Study of Top Management Engagement in Total Quality Management: A Case of Pakistan’s Construction Industry |
title_short |
An Empirical Study of Top Management Engagement in Total Quality Management: A Case of Pakistan’s Construction Industry |
title_full |
An Empirical Study of Top Management Engagement in Total Quality Management: A Case of Pakistan’s Construction Industry |
title_fullStr |
An Empirical Study of Top Management Engagement in Total Quality Management: A Case of Pakistan’s Construction Industry |
title_full_unstemmed |
An Empirical Study of Top Management Engagement in Total Quality Management: A Case of Pakistan’s Construction Industry |
title_sort |
empirical study of top management engagement in total quality management: a case of pakistan’s construction industry |
publisher |
Serbian Project Management Association - IPMA Serbia |
series |
European Project Management Journal |
issn |
2560-4961 |
publishDate |
2020-08-01 |
description |
Top management obligation towards quality
management is seen as one of the key factors in deciding its
success. The local construction industry of Pakistan is far away
from construction quality principles. In connection to this, the
current study attempts to indicate the significance of quality
management of Pakistani construction industry from the
perspective of top management engagement. The constructs were
extracted from published literature based on top management
engagement and investigated the top management’s engagement
towards quality administration in the construction industry.
Survey questionnaires were distributed among senior
management from the construction organizations registered with
Pakistan Engineering Counsel. From the results, it is
demonstrated that top management is willing to adopt most of the
constructs however, it is astonishing that the interest to
incorporate quality management in cost and time perspectives is
still lacking. Hence, the areas of quality are still a secondary
consideration for most of the top management. Therefore, it is the
need of hour that this attitude must be expanded to a more
agreeable level. |
topic |
quality quality management top management construction industry |
url |
http://media.epmj.org/2020/09/2-Irfan.pdf |
work_keys_str_mv |
AT muhammadirfan anempiricalstudyoftopmanagementengagementintotalqualitymanagementacaseofpakistansconstructionindustry AT shafiullah anempiricalstudyoftopmanagementengagementintotalqualitymanagementacaseofpakistansconstructionindustry AT mahanadeem anempiricalstudyoftopmanagementengagementintotalqualitymanagementacaseofpakistansconstructionindustry AT muhammadirfan empiricalstudyoftopmanagementengagementintotalqualitymanagementacaseofpakistansconstructionindustry AT shafiullah empiricalstudyoftopmanagementengagementintotalqualitymanagementacaseofpakistansconstructionindustry AT mahanadeem empiricalstudyoftopmanagementengagementintotalqualitymanagementacaseofpakistansconstructionindustry |
_version_ |
1716830273837989888 |