PROJECT ACTIVITY ANALYSIS WITHOUT THE NETWORK MODEL
<p>ENGLISH ABSTRACT: This paper presents a new procedure for analysing and managing activity sequences in projects. The new procedure determines critical activities, critical path, start times, free floats, crash limits, and other useful information without the use of the network model...
Main Author: | S. Munapo |
---|---|
Format: | Article |
Language: | English |
Published: |
Stellenbosch University
2012-01-01
|
Series: | South African Journal of Industrial Engineering |
Online Access: | http://sajie.journals.ac.za/pub/article/view/68 |
Similar Items
-
A return to the traveling salesman model: a network branch and bound approach
by: Elias Munapo
Published: (2013-02-01) -
Development of an exact method for zero-one linear programming model
by: Elias Munapo
Published: (2020-10-01) -
Investigating causes of delays and cost escalation in project execution during turnarounds
by: Mfanimpela Zacharia Mhlanga, et al.
Published: (2016-07-01) -
A minimum incoming weight label method and its application in CPM networks
by: E Munapo, et al.
Published: (2008-06-01) -
Development of a method to linearize the quadratic assignment problem
by: Elias Munapo
Published: (2021-04-01)