PROJECT ACTIVITY ANALYSIS WITHOUT THE NETWORK MODEL
<p>ENGLISH ABSTRACT: This paper presents a new procedure for analysing and managing activity sequences in projects. The new procedure determines critical activities, critical path, start times, free floats, crash limits, and other useful information without the use of the network model...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Stellenbosch University
2012-01-01
|
Series: | South African Journal of Industrial Engineering |
Online Access: | http://sajie.journals.ac.za/pub/article/view/68 |
id |
doaj-245293bdae82455cb979863b0cd88cc1 |
---|---|
record_format |
Article |
spelling |
doaj-245293bdae82455cb979863b0cd88cc12020-11-24T23:56:50ZengStellenbosch UniversitySouth African Journal of Industrial Engineering1012-277X2224-78902012-01-01211PROJECT ACTIVITY ANALYSIS WITHOUT THE NETWORK MODELS. Munapo<p>ENGLISH ABSTRACT: This paper presents a new procedure for analysing and managing activity sequences in projects. The new procedure determines critical activities, critical path, start times, free floats, crash limits, and other useful information without the use of the network model. Even though network models have been successfully used in project management so far, there are weaknesses associated with the use. A network is not easy to generate, and dummies that are usually associated with it make the network diagram complex – and dummy activities have no meaning in the original project management problem. The network model for projects can be avoided while still obtaining all the useful information that is required for project management. What are required are the activities, their accurate durations, and their predecessors.</p><p>AFRIKAANSE OPSOMMING: Die navorsing beskryf ’n nuwerwetse metode vir die ontleding en bestuur van die sekwensiële aktiwiteite van projekte. Die voorgestelde metode bepaal kritiese aktiwiteite, die kritieke pad, aanvangstye, speling, verhasing, en ander groothede sonder die gebruik van ’n netwerkmodel. Die metode funksioneer bevredigend in die praktyk, en omseil die administratiewe rompslomp van die tradisionele netwerkmodelle.</p>http://sajie.journals.ac.za/pub/article/view/68 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
S. Munapo |
spellingShingle |
S. Munapo PROJECT ACTIVITY ANALYSIS WITHOUT THE NETWORK MODEL South African Journal of Industrial Engineering |
author_facet |
S. Munapo |
author_sort |
S. Munapo |
title |
PROJECT ACTIVITY ANALYSIS WITHOUT THE NETWORK MODEL |
title_short |
PROJECT ACTIVITY ANALYSIS WITHOUT THE NETWORK MODEL |
title_full |
PROJECT ACTIVITY ANALYSIS WITHOUT THE NETWORK MODEL |
title_fullStr |
PROJECT ACTIVITY ANALYSIS WITHOUT THE NETWORK MODEL |
title_full_unstemmed |
PROJECT ACTIVITY ANALYSIS WITHOUT THE NETWORK MODEL |
title_sort |
project activity analysis without the network model |
publisher |
Stellenbosch University |
series |
South African Journal of Industrial Engineering |
issn |
1012-277X 2224-7890 |
publishDate |
2012-01-01 |
description |
<p>ENGLISH ABSTRACT: This paper presents a new procedure for analysing and managing activity sequences in projects. The new procedure determines critical activities, critical path, start times, free floats, crash limits, and other useful information without the use of the network model. Even though network models have been successfully used in project management so far, there are weaknesses associated with the use. A network is not easy to generate, and dummies that are usually associated with it make the network diagram complex – and dummy activities have no meaning in the original project management problem. The network model for projects can be avoided while still obtaining all the useful information that is required for project management. What are required are the activities, their accurate durations, and their predecessors.</p><p>AFRIKAANSE OPSOMMING: Die navorsing beskryf ’n nuwerwetse metode vir die ontleding en bestuur van die sekwensiële aktiwiteite van projekte. Die voorgestelde metode bepaal kritiese aktiwiteite, die kritieke pad, aanvangstye, speling, verhasing, en ander groothede sonder die gebruik van ’n netwerkmodel. Die metode funksioneer bevredigend in die praktyk, en omseil die administratiewe rompslomp van die tradisionele netwerkmodelle.</p> |
url |
http://sajie.journals.ac.za/pub/article/view/68 |
work_keys_str_mv |
AT smunapo projectactivityanalysiswithoutthenetworkmodel |
_version_ |
1725456295530594304 |