The accuracy of measurements in a time study of harvester operations

Abstract Background Work time measurements are the starting point for any calculation of unit costs of machine exploitation; therefore, the accuracy of evaluating these costs determines the economic effectiveness of technological solutions employed in forest work. The research aimed to determine the...

Full description

Bibliographic Details
Main Authors: Grzegorz Szewczyk, Janusz M. Sowa
Format: Article
Language:English
Published: Scion 2017-12-01
Series:New Zealand Journal of Forestry Science
Subjects:
Online Access:http://link.springer.com/article/10.1186/s40490-017-0105-3
id doaj-2391741f620447f69718ebe46d74eb67
record_format Article
spelling doaj-2391741f620447f69718ebe46d74eb672020-11-25T00:03:50ZengScionNew Zealand Journal of Forestry Science1179-53952017-12-0147111010.1186/s40490-017-0105-3The accuracy of measurements in a time study of harvester operationsGrzegorz Szewczyk0Janusz M. Sowa1Institute of Forest Utilization and Forest Technology, Department of Forest and Wood Utilization, University of Agriculture in KrakowInstitute of Forest Utilization and Forest Technology, Department of Forest and Wood Utilization, University of Agriculture in KrakowAbstract Background Work time measurements are the starting point for any calculation of unit costs of machine exploitation; therefore, the accuracy of evaluating these costs determines the economic effectiveness of technological solutions employed in forest work. The research aimed to determine the level of measurement error of harvester operation times by means of a chronometric method. Methods Different methods for measuring the components of the work cycle in cut-to-length harvesting operations were compared. These operations consisted of a thinning and a clear-cut harvesting operation in two Scots pine (Pinus sylvestris L.) stands in central Poland. The average duration of a work cycle was determined from cumulative timing using either the on-board PSION microcomputers or analysis of video footage. Results from these two methods were compared with the standard method used in work study which is snap-back timing (i.e. the timer is reset at the end of each activity within the work cycle, the average time for each activity calculated and then summed to give the average cycle time) using the PSION microcomputer. Results The average duration of the work cycles estimated from cumulative timing of video footage were 55.0 and 52.3 s for the thinning and clear-cut operations, respectively. The cumulative timing method using the PSION on-board computer underestimated these cycle times by ca. 14% in thinning operations and by 22% in clear-cut operations. The snap-back timing method, which measures the duration of certain operations separately, underestimated the average work cycle time in the clear-cut operation by 6% but overestimated it by ca. 12% in the thinning operation. In both operations, most of the difference in work cycle time estimates were due to differences in the time recorded for delimbing and bucking activities. Conclusions The accuracy of work time measurement taken using the standard methods—snap-back timing—depends on the variability of work cycles. The hitherto employed method of snap-back timing is more accurate than the cumulative timing method with respect to both stable and more changeable work cycles.http://link.springer.com/article/10.1186/s40490-017-0105-3Time studyHarvesterTimber harvesting
collection DOAJ
language English
format Article
sources DOAJ
author Grzegorz Szewczyk
Janusz M. Sowa
spellingShingle Grzegorz Szewczyk
Janusz M. Sowa
The accuracy of measurements in a time study of harvester operations
New Zealand Journal of Forestry Science
Time study
Harvester
Timber harvesting
author_facet Grzegorz Szewczyk
Janusz M. Sowa
author_sort Grzegorz Szewczyk
title The accuracy of measurements in a time study of harvester operations
title_short The accuracy of measurements in a time study of harvester operations
title_full The accuracy of measurements in a time study of harvester operations
title_fullStr The accuracy of measurements in a time study of harvester operations
title_full_unstemmed The accuracy of measurements in a time study of harvester operations
title_sort accuracy of measurements in a time study of harvester operations
publisher Scion
series New Zealand Journal of Forestry Science
issn 1179-5395
publishDate 2017-12-01
description Abstract Background Work time measurements are the starting point for any calculation of unit costs of machine exploitation; therefore, the accuracy of evaluating these costs determines the economic effectiveness of technological solutions employed in forest work. The research aimed to determine the level of measurement error of harvester operation times by means of a chronometric method. Methods Different methods for measuring the components of the work cycle in cut-to-length harvesting operations were compared. These operations consisted of a thinning and a clear-cut harvesting operation in two Scots pine (Pinus sylvestris L.) stands in central Poland. The average duration of a work cycle was determined from cumulative timing using either the on-board PSION microcomputers or analysis of video footage. Results from these two methods were compared with the standard method used in work study which is snap-back timing (i.e. the timer is reset at the end of each activity within the work cycle, the average time for each activity calculated and then summed to give the average cycle time) using the PSION microcomputer. Results The average duration of the work cycles estimated from cumulative timing of video footage were 55.0 and 52.3 s for the thinning and clear-cut operations, respectively. The cumulative timing method using the PSION on-board computer underestimated these cycle times by ca. 14% in thinning operations and by 22% in clear-cut operations. The snap-back timing method, which measures the duration of certain operations separately, underestimated the average work cycle time in the clear-cut operation by 6% but overestimated it by ca. 12% in the thinning operation. In both operations, most of the difference in work cycle time estimates were due to differences in the time recorded for delimbing and bucking activities. Conclusions The accuracy of work time measurement taken using the standard methods—snap-back timing—depends on the variability of work cycles. The hitherto employed method of snap-back timing is more accurate than the cumulative timing method with respect to both stable and more changeable work cycles.
topic Time study
Harvester
Timber harvesting
url http://link.springer.com/article/10.1186/s40490-017-0105-3
work_keys_str_mv AT grzegorzszewczyk theaccuracyofmeasurementsinatimestudyofharvesteroperations
AT januszmsowa theaccuracyofmeasurementsinatimestudyofharvesteroperations
AT grzegorzszewczyk accuracyofmeasurementsinatimestudyofharvesteroperations
AT januszmsowa accuracyofmeasurementsinatimestudyofharvesteroperations
_version_ 1725431753118580736