AN ANALYSIS OF PUMP POWER CALCULATION OF CONVERTED BANDUNG TRIGA REACTOR WITH PIPE ROUTING THROUGH DELAY TANK
The Bandung TRIGA 2000 Reactor has been widely used for conducting training, researches and isotop production since 1965. This reactor have to be decommissioned due no further fuelproduced by original vendor. Therefore, conversion of cylinder fuel into plate is needed. PT INUKI has been able to prod...
Main Authors: | Veronica Indriati Sri Wardhani, Budi Santoso |
---|---|
Format: | Article |
Language: | English |
Published: |
Badan Tenaga Nuklir Nasional (BATAN)
2018-11-01
|
Series: | Tri Dasa Mega |
Online Access: | http://jurnal.batan.go.id/index.php/tridam/article/view/4623 |
Similar Items
-
ROUTING DESIGN ON THE PRIMARY COOLING PIPING SYSTEM IN PLATE-TYPE CONVERTED TRIGA 2000 REACTOR BANDUNG
by: Veronica Indriati Sri Wardhani, et al.
Published: (2019-11-01) -
Piping Flexibility Analysis of the Primary Cooling System of TRIGA 2000 Bandung Reactor due to Earthquake
by: H.P. Rahardjo
Published: (2011-08-01) -
PENGARUH BENTUK ROUTING PERPIPAAN SISTEM PENDINGIN PRIMER REAKTOR TRIGA KONVERSI TERHADAP PENURUNAN AKTIVITAS N-16 DI PERMUKAAN TANGKI REAKTOR
by: Veronica Indriati Sri Wardhani, et al.
Published: (2016-10-01) -
BURNUP CALCULATIONS OF THE JSI TRIGA REACTOR FUEL AND COMPARISON WITH MEASUREMENTS
by: Anže Pungerčič, et al.
Published: (2021-01-01) -
ANALYSIS OF GAMMA HEATING AT TRIGA MARK REACTOR CORE BANDUNG USING PLATE TYPE FUEL
by: Setiyanto Setiyanto, et al.
Published: (2016-10-01)