AN ANALYSIS OF PUMP POWER CALCULATION OF CONVERTED BANDUNG TRIGA REACTOR WITH PIPE ROUTING THROUGH DELAY TANK
The Bandung TRIGA 2000 Reactor has been widely used for conducting training, researches and isotop production since 1965. This reactor have to be decommissioned due no further fuelproduced by original vendor. Therefore, conversion of cylinder fuel into plate is needed. PT INUKI has been able to prod...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Badan Tenaga Nuklir Nasional (BATAN)
2018-11-01
|
Series: | Tri Dasa Mega |
Online Access: | http://jurnal.batan.go.id/index.php/tridam/article/view/4623 |