Post-Installation: Insight of coastal-area society in Hybrid Electric Power Systems (HEPS) of Pantai Baru, Yogyakarta
The Hybrid Electric Power Systems project is a pilot renewable energy project of the Indonesian Ministry of Research and Technology since 2010. Hybrid power (windmill and solar cell) was chosen because of their huge heat and wind potential in coastal area of Pantai Baru. Post-installation is critica...
Main Author: | Widhyharto Derajad S. |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://doi.org/10.1051/e3sconf/20184201002 |
Similar Items
-
Perempuan Sebagai Agen Perubahan Sosial-Ekonomi Masyarakat Pesisir Sekitar PLTH (Pembangkit Listrik Tenaga Hybrid) Pantai Baru, Kabupaten Bantul, Daerah Istimewa Yogyakarta
by: Derajad S. Widhyharto
Published: (2015-09-01) -
Komunitas Berpagar: Antara Inovasi Sosial dan Ketegangan Sosial (Studi Kasus Komunitas Berpagar di Propinsi D.I Yogyakarta, Indonesia)
by: Derajad S. Widhyharto
Published: (2009-11-01) -
Silent Political Apathy in Urban Society: The Case of Medan 2018 Election
by: Derajad Sulistyo Widhyharto, et al.
Published: (2021-03-01) -
Strategi Penciptaan Pelayanan Kesehatan Dasar untuk Kemudahan Akses Penduduk Desa Miskin
by: Sunyoto Usman, et al.
Published: (2010-03-01) -
Microplastics in Pelagic and Demersal Fishes of Pantai Baron, Yogyakarta, Indonesia
by: Nurul Suwartiningsih, et al.
Published: (2020-05-01)