Analysis of Stuck Pipe Incidents in Khabaz Field

There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alt...

Full description

Bibliographic Details
Main Authors: Nazaneen Said Amina, Ayad A.Alhaleemb
Format: Article
Language:English
Published: University of Baghdad/College of Engineering 2018-12-01
Series:Iraqi Journal of Chemical and Petroleum Engineering
Subjects:
Online Access:http://ijcpe.uobaghdad.edu.iq/index.php/ijcpe/article/view/508