Analysis of Stuck Pipe Incidents in Khabaz Field
There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alt...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Baghdad/College of Engineering
2018-12-01
|
Series: | Iraqi Journal of Chemical and Petroleum Engineering |
Subjects: | |
Online Access: | http://ijcpe.uobaghdad.edu.iq/index.php/ijcpe/article/view/508 |