Study on the Calculation of the Post-construction Settlement after the Secondary Preloading of Sand Pile Composite Foundation of the High-speed Railway
To complete the technology upgrade of the Kunshan section of the Beijing-Shanghai Railway, the secondary preloading of the original sand pile foundation was carried out in five years after the completion of the railway. Whether the control requirements of the post-construction settlement of the upgr...
Main Authors: | Shen Zuo, Jin Li, Li Zhang |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201820601016 |
Similar Items
-
Settlement of foundations on sand
by: Tselalis, Antonios I
Published: (1981) -
Experiments on model pile foundations in sand
by: Walker, Barry Preston
Published: (1964) -
Research on character of screw pile group composite foundation used in high-speed railway
by: Zhao Maocai, et al.
Published: (2019-01-01) -
Design Method and Verification of Electroosmosis-Vacuum Preloading Method for Sand-Interlayered Soft Foundation
by: Yunliang Cui, et al.
Published: (2020-01-01) -
Friction piles behavior in soil base and piles settlement calculation
by: Utkin Vladimir S.
Published: (2018-10-01)