Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan

Due to the poorly developed road network in Kazakhstan and the poor condition of the existing road communications, the issue of construction of new and reconstruction of existing roads is really crucial for the country. The article examines the problems of road construction in Central Kazakhstan, an...

Full description

Bibliographic Details
Main Authors: Adil Kadyrov, Vyacheslav Kunaev, Ivan Georgiadi, Rashid Khaibullin
Format: Article
Language:English
Published: Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek 2019-01-01
Series:Tehnički Vjesnik
Subjects:
Online Access:https://hrcak.srce.hr/file/325881
id doaj-201f62613d0a4bcb8c2e0f1337bb10ed
record_format Article
spelling doaj-201f62613d0a4bcb8c2e0f1337bb10ed2020-11-24T22:07:24ZengFaculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek Tehnički Vjesnik1330-36511848-63392019-01-0126411591163Advanced Methods for Solving the Problems of Road Construction in Central KazakhstanAdil Kadyrov0Vyacheslav Kunaev1Ivan Georgiadi2Rashid Khaibullin3Karaganda State Technical University, Department of Transport Technics and Logistics Systems, Krivoguz street, 86, 100000, Karaganda, KazakhstanKaraganda State Industrial University, Department of Technological Machines and Transport, Shkolnaya street, 7-15, 101402, Temirtau, KazakhstanKaraganda State Technical University, Department of Transport Technics and Logistics Systems, Zelenaya street, 24, 101400, Temirtau, KazakhstanKaraganda State Technical University, Department of Industrial Transport named prof. A.N. Daniyarov, Lenin street, 61/2-19, 100017 Karaganda, KazakhstanDue to the poorly developed road network in Kazakhstan and the poor condition of the existing road communications, the issue of construction of new and reconstruction of existing roads is really crucial for the country. The article examines the problems of road construction in Central Kazakhstan, and proposes specific solutions to some of them. To reduce the construction cost of the subbase, the article suggests using a new building material instead of natural stone rubble. It is made of waste and by-products of manufacturing available in the region (blast-furnace slag and microsilica) hydrophobizated by used engine oil. Photos of the laboratory samples and the results of the experimental researches of this road-building material are attached to the article. To reduce the labour intensity of stiff and frozen soil excavation during the preparation of the subgrade, the article provides the use of a new working part of excavation machine. This working component is a cutterhead developed at the premises of The Karaganda State Technical University. The article deals with construction of this machine and principle of its operation.https://hrcak.srce.hr/file/325881Central Kazakhstanconstructioncutterheadexcavation of stiff and frozen soilsroad-building materialsslag-crushed stone
collection DOAJ
language English
format Article
sources DOAJ
author Adil Kadyrov
Vyacheslav Kunaev
Ivan Georgiadi
Rashid Khaibullin
spellingShingle Adil Kadyrov
Vyacheslav Kunaev
Ivan Georgiadi
Rashid Khaibullin
Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan
Tehnički Vjesnik
Central Kazakhstan
construction
cutterhead
excavation of stiff and frozen soils
road-building materials
slag-crushed stone
author_facet Adil Kadyrov
Vyacheslav Kunaev
Ivan Georgiadi
Rashid Khaibullin
author_sort Adil Kadyrov
title Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan
title_short Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan
title_full Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan
title_fullStr Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan
title_full_unstemmed Advanced Methods for Solving the Problems of Road Construction in Central Kazakhstan
title_sort advanced methods for solving the problems of road construction in central kazakhstan
publisher Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek
series Tehnički Vjesnik
issn 1330-3651
1848-6339
publishDate 2019-01-01
description Due to the poorly developed road network in Kazakhstan and the poor condition of the existing road communications, the issue of construction of new and reconstruction of existing roads is really crucial for the country. The article examines the problems of road construction in Central Kazakhstan, and proposes specific solutions to some of them. To reduce the construction cost of the subbase, the article suggests using a new building material instead of natural stone rubble. It is made of waste and by-products of manufacturing available in the region (blast-furnace slag and microsilica) hydrophobizated by used engine oil. Photos of the laboratory samples and the results of the experimental researches of this road-building material are attached to the article. To reduce the labour intensity of stiff and frozen soil excavation during the preparation of the subgrade, the article provides the use of a new working part of excavation machine. This working component is a cutterhead developed at the premises of The Karaganda State Technical University. The article deals with construction of this machine and principle of its operation.
topic Central Kazakhstan
construction
cutterhead
excavation of stiff and frozen soils
road-building materials
slag-crushed stone
url https://hrcak.srce.hr/file/325881
work_keys_str_mv AT adilkadyrov advancedmethodsforsolvingtheproblemsofroadconstructionincentralkazakhstan
AT vyacheslavkunaev advancedmethodsforsolvingtheproblemsofroadconstructionincentralkazakhstan
AT ivangeorgiadi advancedmethodsforsolvingtheproblemsofroadconstructionincentralkazakhstan
AT rashidkhaibullin advancedmethodsforsolvingtheproblemsofroadconstructionincentralkazakhstan
_version_ 1725820623786082304