Effect of irrigation network rehabilitation on water management-case study: Tanta Navigation canal – Egypt
Tanta Navigation canal is a 38.0 km long main canal serving 65,000 ha. in the Nile Middle Delta of Egypt. The main branch of Tanta canal is El-Kased canal with 34.0 km long, and serving 60% of Tanta Canal served area.The main problem was the inability to convey the required water supply to the secon...
Main Authors: | Talaat ElGamal, Mohamed ElFetyany, Gamal ElKassar |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2019-12-01
|
Series: | Alexandria Engineering Journal |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1110016819301085 |
Similar Items
-
Assessment of national water footprint versus water availability - Case study for Egypt
by: Mohamed ElFetyany, et al.
Published: (2021-08-01) -
Study the Effect of Food Waste on Egypt Water Resources - wheat case study
by: Mohamed ElFetyany, et al.
Published: (2021-09-01) -
Economic planning and operational control of an irrigation project
by: El-Kassar, Gamal Mohamed
Published: (2002) -
Reduction of mesqa improvement costs
by: Mohamed Ahmed Saad ElFetyany
Published: (2017-10-01) -
Evaluating the Design and Operation of Irrigation Canals in Egypt
by: Kayal, Amany El
Published: (1983)