COMPARISONS BETWEEN AND COMBINATIONS OF DIFFERENT APPROACHES TO ACCELERATE ENGINEERING PROJECTS
<p>ENGLISH ABSTRACT: In this article, traditional project management methods such as PERT and CPM, as well as fast-tracking and systems approaches, viz. concurrent engineering and critical chain, are reviewed with specific reference to their contribution to reducing the duration of the...
Main Author: | H. Steyn |
---|---|
Format: | Article |
Language: | English |
Published: |
Stellenbosch University
2012-01-01
|
Series: | South African Journal of Industrial Engineering |
Online Access: | http://sajie.journals.ac.za/pub/article/view/266 |
Similar Items
-
PROJECT MANAGEMENT MATURITY AND PROJECT MANAGEMENT SUCCESS IN THE ENGINEERING AND CONSTRUCTION INDUSTRIES IN SOUTHERN AFRICA
by: Steyn, H., et al.
Published: (2012-11-01) -
DEVELOPMENT OF A PROJECT MANAGEMENT METHODOLOGY FOR THE CONSULTING ENGINEERING INDUSTRY
by: J.T. Labuschagne, et al.
Published: (2012-01-01) -
DEFINING ‘PROJECT SUCCESS’ FOR A COMPLEX PROJECT – THE CASE OF A NUCLEAR ENGINEERING DEVELOPMENT
by: S.I. Van Niekerk, et al.
Published: (2012-01-01) -
COMPUTERISED INFORMATION SYSTEMS: COMPARISON OF RELATIVE IMPACTS ON PLANNED PROJECT DURATION WITHIN A MULTI-PROJECT ENVIRONMENT
by: S. Govender, et al.
Published: (2012-01-01) -
Comparison of the Accelerator-Pedal-to-Engine-Control-Module Interfaces on Vehicles With Low and High Reported Rates of Unintended Acceleration
by: Dexin Zhang, et al.
Published: (2015-01-01)