The Production Measurement Model of Open Pit Mine Based on Truck Operation Diagram
Conventional production measurement of truck dispatching system in open pit mine has not been effectively expressed by a mathematical model, which brings a negative effect on the subsequent data mining and a compatibility issue to apply the production measurement with fixed assignment of truck. In t...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2016-01-01
|
Series: | ITM Web of Conferences |
Online Access: | http://dx.doi.org/10.1051/itmconf/20160709007 |
id |
doaj-1eb3fe7c677c4d9eb57cdcb37ec9f136 |
---|---|
record_format |
Article |
spelling |
doaj-1eb3fe7c677c4d9eb57cdcb37ec9f1362021-02-02T02:50:55ZengEDP SciencesITM Web of Conferences2271-20972016-01-0170900710.1051/itmconf/20160709007itmconf_ita2016_09007The Production Measurement Model of Open Pit Mine Based on Truck Operation DiagramSun Xiao-YuKong XiaoZhang Wei-GuoConventional production measurement of truck dispatching system in open pit mine has not been effectively expressed by a mathematical model, which brings a negative effect on the subsequent data mining and a compatibility issue to apply the production measurement with fixed assignment of truck. In this study, based on the proposed concept that truck is not only the carrier of transport material, but also act as the bridges and linkages between the loading sites and the unloading sites, a new truck operation diagram was established, which was further developed to a basic data matrix and a production measurement model. The new model allowed to calculatethe production measurement of the transport, loading, unloading, material and etc, respectively, as well as with any calculation in combination of more than one factor as needed.It solved the compatibility issue between conventional production measurement and the production measurement of fixed assignment of truck with good practical results.http://dx.doi.org/10.1051/itmconf/20160709007 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Sun Xiao-Yu Kong Xiao Zhang Wei-Guo |
spellingShingle |
Sun Xiao-Yu Kong Xiao Zhang Wei-Guo The Production Measurement Model of Open Pit Mine Based on Truck Operation Diagram ITM Web of Conferences |
author_facet |
Sun Xiao-Yu Kong Xiao Zhang Wei-Guo |
author_sort |
Sun Xiao-Yu |
title |
The Production Measurement Model of Open Pit Mine Based on Truck Operation Diagram |
title_short |
The Production Measurement Model of Open Pit Mine Based on Truck Operation Diagram |
title_full |
The Production Measurement Model of Open Pit Mine Based on Truck Operation Diagram |
title_fullStr |
The Production Measurement Model of Open Pit Mine Based on Truck Operation Diagram |
title_full_unstemmed |
The Production Measurement Model of Open Pit Mine Based on Truck Operation Diagram |
title_sort |
production measurement model of open pit mine based on truck operation diagram |
publisher |
EDP Sciences |
series |
ITM Web of Conferences |
issn |
2271-2097 |
publishDate |
2016-01-01 |
description |
Conventional production measurement of truck dispatching system in open pit mine has not been effectively expressed by a mathematical model, which brings a negative effect on the subsequent data mining and a compatibility issue to apply the production measurement with fixed assignment of truck. In this study, based on the proposed concept that truck is not only the carrier of transport material, but also act as the bridges and linkages between the loading sites and the unloading sites, a new truck operation diagram was established, which was further developed to a basic data matrix and a production measurement model. The new model allowed to calculatethe production measurement of the transport, loading, unloading, material and etc, respectively, as well as with any calculation in combination of more than one factor as needed.It solved the compatibility issue between conventional production measurement and the production measurement of fixed assignment of truck with good practical results. |
url |
http://dx.doi.org/10.1051/itmconf/20160709007 |
work_keys_str_mv |
AT sunxiaoyu theproductionmeasurementmodelofopenpitminebasedontruckoperationdiagram AT kongxiao theproductionmeasurementmodelofopenpitminebasedontruckoperationdiagram AT zhangweiguo theproductionmeasurementmodelofopenpitminebasedontruckoperationdiagram AT sunxiaoyu productionmeasurementmodelofopenpitminebasedontruckoperationdiagram AT kongxiao productionmeasurementmodelofopenpitminebasedontruckoperationdiagram AT zhangweiguo productionmeasurementmodelofopenpitminebasedontruckoperationdiagram |
_version_ |
1724308970153181184 |